Tenders Are Invited For Secondary School Construction Work-Establishment Of Infrastructure Primary And Secondary School With Grades I-Viii, In Domnești Commune, Ilfov County
Tenders Are Invited For Secondary School Construction Work-Establishment Of Infrastructure Primary And Secondary School With Grades I-Viii, In Domnești Commune, Ilfov County
Secondary School Construction Work-Establishment Of Infrastructure Primary And Secondary School With Grades I-Viii, In Domnești Commune, Ilfov County. The Project Will Include The Following Volumes:- C1- School-P+2E; - C2- Porter-Party Cab; - C3- After-School Building, P+1E; - Arrangement Of A Sports Field With A Dimension Of 43X22m; - Arranging A Parking Lot For 16 Cars; - The Specific Exterior Arrangement Of The Schools The Construction Of C1 Within The Scenario Will Have A Height Regime Of Gf+2E With Certain Areas Of Volumetry Withdrawn And Established At Gf+1E. The Maximum Plane Dimensions Of The Construction Are 62.45M X 51.10 M. The Height From The Sidewalk To The Attic Is Max 13.85M On The Southeast Area And Min 10.20M On The Northwest Area. As An Arrangement In The Plan Of The A Scenario, It Was Opted To A L Facility That Follows The Direction Of The Streets Proposed In The Area. This Is Taken Into Account The Arrangement Of 2 Elongated Bodies P+2E Aligned In The Direction Of The Streets And Connected In Their Intersection By A P+2E Body With High Attic As A Connection Element And Once A Volumetric Accent. The Arrangement Of The L Form Will Be Closed At The Same Time With A Gf+1E Volume And Will Generate An Exterior Central Court That Will Allow The Interior Space To Illuminate. Access To The Premises Will Be Made In A Characteristic Way To The Educational Framework, So We Will Have Secure Access For Students And Secure Access For Teachers. Access To The Building Will Be Made Through 3 Steps That Make The Difference Of 45 Cm Between The Level 0.00 And The Area Of The Land Arranged. The Structure Is Made Up Of Reinforced Concrete Frames And With Porotherm Brick Masonry Thermal Insulated With The Basalt Mineral Wool Of 20Cm. The Infrastructure Is Made Up As A Rigid Box Consisting Of 30Cm Thick Concrete Walls And Continuous Reinforced Soles. The Reinforced Soles Have The Section Of 100X60cm And Pour On A Simple 100Cm Thick Concrete. The Construction Of C3 Within The Scenario Will Have A Height Regime Of Gf+1E And A Form In The Plane, Having In The Middle An Open Terrace, With Access From The Canteen Room On The Ground Floor. The Maximum Plane Dimensions Of The Construction Are 22.25M X 18.50 M. The Height From The Sidewalk To The Attic Is Max 8.65M. From A Structural Point Of View, The C3 Body Will Be Treated The Same As The C1 Body Of The School. Urban Indices Recommended Scenario. Body C1 - Gymnasium School. • Height Regime: P+2E. • Hmaxim: 13.60 M (Measure From The Level 0.00 Of The Ground Floor). • The Built Area Of Ground Floor: 1483.50 Sqm. • Built Surface 1: 1344.00 Sqm. • The Built Area 2: 1140.50 Sqm. • The Surface Carried Out: 3968.00 Sqm. • Pot: 1.65% • Cut: 0.04. C2 Body - Guard Cabbine. • Height Regime: P. • Hmaxim: 3.10 M (Measure From The Level 0.00 Of The Ground Floor) • The Built Area: 19.50 Sqm. • The Surface Carried Out: 19.50 Sqm. • Pot: 0.02% • Cut: 0.0002. Body C3 - After School • Height Regime: P+1E. • Hmaxim: 8.65 M (Measured From The Sidewalk Level). • The Built Area Of Ground Floor: 373.50 Sqm. • Built Surface 1: 328.70 Sqm. • The Surface Carried Out: 702.20 Sqm. • Pot: 0.41% • Cut: 0.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.