Tenders Are Invited For Engineering Services-Vgv Specialist Planning Tga (Elektro) -New Building Workshops Of The Ferdinand-Von-Steinbeis Commercial School, Tuttlingen
Tenders Are Invited For Engineering Services-Vgv Specialist Planning Tga (Elektro) -New Building Workshops Of The Ferdinand-Von-Steinbeis Commercial School, Tuttlingen
Engineering Services-Vgv Specialist Planning Tga (Elektro) -New Building Workshops Of The Ferdinand-Von-Steinbeis Commercial School, Tuttlingen. The Ferdinand Von Steinbeis School (Fvss) Currently Consists Of The Parts Of The Building A, B, C And D. The Interventions In Component A And B Are To Be Kept As Minor As Possible (Built In 2009, 2-3-Storey). Adjustments / Conversion Measures In The Oldest Component, Component C (Built In 1950S, 4-Storey, Reinforced Concrete Skeleton Construction) Must Be Reduced To The Bare Most. The Cafeteria And The Student Residence Room Are To Be Planned In Component C On The Ground Floor. Component D (Year Of Construction Late 1970S) Is To Be Dismantled And The Replacement Building Is Built At The Same Location. Both Structural And Organizational Interim Measures Are Required To Maintain School Operations During The Construction Phase. Partial Services Of The Specialist Planners May Be Required To Plan The Demolition And Structural Interim Solutions. Sustainability The Max. 4 Storey Buildings May Be Planned And Created As Wood /Wood Hybrid Construction. When Choosing A Material For Construction, Building Envelope And Interior Design, The Outgoing Value Attaches Importance To Looking At The Life Cycle Of The Building. Both The Production Of The Materials And Their Installation As Well As The Dismantling And The Possibility Of Recycling Play A Role Here. A High Degree Of Prefabrication Of The Components Must Be Striving For. According To The Legal Requirements, The New Roof Areas Are To Be Carried Out As Largely As Possible As A Green Roof In Combination With Photovoltaic Systems. In The Competition To Achieve The Climate Goals, The Run -Up Would Like To Consciously Handle Resources In The Production, Construction And Operation Of The Building. With The Construction, The Components And The Useful Life Of The Building Materials, The Co2 Emissions Of The Building Are To Be Sustainably Reduced. The Sustainability Criteria In Accordance With Sustainable Construction In Baden-Württemberg (Nbbw) From The State Ministry Of State Development And Living Baden-Württemberg Must Be Taken Into Account In The Further Planning. A Promotion By The Specialist Planners For The Object Planning To Prove The Sustainability Criteria Is Required. Planning Starts Immediately After The Vgv Procedure Has Been Completed And After The Committee Decision. The Cost Kg 300+400 Net Is Estimated At Around € 18.5 Million. It Is Planned To Apply For Funding. The Negotiation Talks Are Expected To Take Place On June 25, 2025 (All -Day) And June 27, 2025 (In The Morning). Addition Tga: Energy Supplies: The Building Is To Be Planned As An Efficiency House Based On The Applicable Building Energy Law. The Energy Supply Is Provided Via A Local Heating Network. The New Building Should Be Connected, As The Existing Buildings. It Is To Plan A Fire Extinguishing System. The Management Plans Are Made Available In The 2Nd Phase Of The Procedure. Additionel: A Usv System And A Language Alarm System / Ngrs Are Part Of The Planning. Green Roofs Are To Be Carried Out In Combination With Photovoltaic Systems. Funding
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.