At The Öbb Ts Location Vienna Jedlersdorf, The Rail Vehicle Wheel Sets Will Be Processed By Means Of An Underfloor Shooting System. For This Purpose, A New Tandem Sub-Flour Turning System (T-Ufd) Is Procured. A New Building At The Jedlersdorf Location With Renewed Tracks Will Be Built In The Existing Plant Halls In The Existing Factory Halls, After And Next To The Hall. Extended As Track 909B (Lg = 105.62M) To The Factory Fence As Well As The Bypass 910Neu 910Neu With A Switch Connection 91/982 And The Track 911, And The Track 910B As A Plug -In, Or Renovated (In Total Approx. 900M. Construction. The Contractor Track Construction Does All Track Construction Work And The Erecting Of The Substructure With 1 Trog Route Over The Entire Length Of The Track 909.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.