Health And Safety Services-2025-14_Elet- Newbau_Brücken_B188_Brenneckenbrück_Öbü_Fiftung Monitoring Concrete Parts_Sigeko. Power Scope Construction Monitoring The Construction Monitoring Of The Engineering Buildings And Transport Systems As Well As The Technical Equipment Includes Monitoring The Execution Of The Project In Accordance With The Documents Approved For Execution, The Construction Contract, Including The Dates Or Deadlines Specified Therein, As Well As The Generally Recognized Rules Of Technology And The Relevant Regulations Under Consideration Of Environmental Requirements. This Includes The Requirements And Conditions From The Planning Approval Decision. As Part Of The Above Generally Described Service Must Be Provided, Among Other Things, The Following Partial Services: - Review Of The Service Description For The Bridge Construction Work With Dismantling, Makeshift Bridges, Road Construction And Equipment - After The Surcharge For The Bau Brücke+Straße. Log In The Construction Recovery Meeting To Instruct The Contractor In The Construction Work - Plan, Moderate And Presentation Of The Plan Collecting Meeting With Ag, Green Auditor, Red Tester, Floor Appraiser, On And Execution Planner Of The An - Preparation, Directing And Logging Of The Basic Discussion In Accordance Of The - Monitoring Of The Contractually Agreed Dates And Deadlines - Immediate Information Of The Ag About Recognizable Changes In The Contractually Agreed Construction Work Between The Building Contractor And The Client Including Disabilities And Interruption Of The Execution As Well As Changes In Quantities - Documentation Of The Construction Process (E.G. B. Construction Diary, Photo Documentation) - Exams Of The Building Dimensions And Control Of The Settlement Measurements - Release Of The Formwork And Reinforcement To Concrete - Presence For Concrete Layers - Control Of Concrete Processing On The Construction Site As Well As Statistical Evaluation Of The Quality Tests - Documentation Of The Disabilities And Interruption Of Execution - Monitoring Of The Adjoining Operations In Accordance With The Subsequent Entrepreneurs Mentioned In The Construction Contract - Arrange And Participate In The Disposal Of The Executive Companies, List Of Further Design Letters On The Disabilities, Concerns And Other Correspondence. Further Partial Services Of The Construction Monitoring Are Described In The Service Description! Power Scope Of The Work-Side Production Monitoring The New Structure Via The Aller Is Trained As A 7-Step Plate Beam. In Order To Further Increase The Clear Height, As Well As To Reduce Repair And Test Effort, The Bridge Is Executed As An Integral Building Without A Warehouse. The Superstructure Is Designed As A Half -Finished Part Made Of Clamping Concrete With A Location Concrete Supplement. - Checking The Manufacturer Qualification Of The Finished Parts, Checking The Production Facilities For Their Suitability For The Respective Project
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.