Expansion Of 8 Forestry Paths With An Unbound Attachment. The Total Length Amounts To Approx. 3.5 Km. In Addition, 5 Turning Points Are Also To Be Produced. Widening 100 M Paths, Earth Movement Up To 2.0 M³/Lfdmca. Make 550 M Folding Path, Earth Movement Up To 0.5 M³/Lfdmca. Loosen 3 700 M³ Of Soil, Load, Promote And Install. 4 400 To. Layer From Unsorted Rock Gestures (Tsug) Grain 0/56 Or 0/65 Mm Deliver And Installca. 250 To. Cover Layer Without Binding Agent (Dob) Grain 0/32 Mm Deliver And Installca. 1 300 To. Deliver And Install The Underground Attachment, Rock Rock 0/100 Mm. 70 To. Deliver And Install The Asphalt Cover Cover Layer 0/16 Mm