1. The Subject Of The Order Is The Modernization Of The Platforms On The Ryński Quay In Ryn, Which Includes The Replacement Of The Structure And Pine Wood Sheathing For The Structure And Wood From The Pressure Of A Pressure Impregnated Larch. 2. The Area Of The Permanent Platform (At Ekomarin) Is 504.96 M2. Bridging Boards Made Of Wooden Larch, Bryped Unilateral, With A Cross -Section Of 50X150 Mm, With A Length Of 3.2 M. Fastening Boards With Fi 6/100 Screws (Two Screws In Combination), From Stainless Steel To Wooden Tongues (K2) With A Cross -Section Of 120X140 Mm , Fastened To The Paddles 120X160 Mm (Ticks K1). Post -Plain Platform Sheathing And Wooden Constructions (Balustrades). According To Drawings - 1 Platforms (At Ekomarin) - 5 Cm Thick, Instead Of 3.8 Cm. 3. The Area Of 2 Pcs Of Floating Platforms Together With Traps (At Ekomarin) Is 462.40 M2. Bridging Boards Made Of Wooden Larch, Bryped Unilaterally, With A Cross -Section Of 50X150 Mm, 3.0 M Long. Fastening Boards With Fi 6/80 Screws (Two Screws In Combination), From Stainless Steel To Wooden Teens (3 Rows) With A Cross -Section Of 100X50 Mm, Attached To The Platform (Concrete). Facil Board Of A Deck Measuring 50X150 Mm.4. The Area Of The Permanent Platform (At The Marina) Is 132.16 M2. Bridging Boards Made Of Wooden Larch, Bryped Unilateral, With A Cross -Section Of 50X150 Mm, With A Length Of 3.2 M. Fastening Boards With Fi 6/100 Screws (Two Screws In Combination), From Stainless Steel To Wooden Tongues (K2) With A Cross -Section Of 120X140 Mm , Fastened To The Paddles 120X160 Mm (Ticks K1). Post -Plating Platform Sheathing And Wooden Structures (Balustrades) Make According To Drawings - 2 Platforms And Barriers (At The Marina) - 5 Cm Thick Decking Instead Of 3.8 Cm. 5. Barriers At The Marina With A Total Length Of 37 M. Make Wooden Constructions (Balustrades) According To Figure6. Wooden Elements Should Be Made Of Seasoned, Airborne Wood, Class K30 (C30), Protected Against Biological Corrosion By Impregnating The Deep Vacuum And Pressure. Cleaning, Repair), Racks For Lifebuilding (Disassembly, Cleaning, Repair), Mooring (Disassembly, Cleaning, Painting), Corrosive Protection (Painting Of Steel Platform Piles, Black, In Black), Corrosive Protection (Painting Of Steel Elements Bridges, Galvanized If Necessary), Replacement Of The Structure And Wooden Plating Of The Platforms As Described And With Attached Drawings, Use Larch Wood, Pressure Impregnated), Replacement Of The Induction Boards On The Slip (At The Descent To The Water), Assembly Of Removed Ladders Bridge, Racks For Lifebuilding, Mooring Cuts, Pedestals With Access To Electricity And Water. Use Seasoned Wood.