Load-Bearing Structure Design Services-Sv-Fla-25210-003-Modernization U-Bahnhof Student City, Structural Engineering Planning. The Measure Intends To Modernize And Renovate The Subway Station At All Building Levels In Order To Remedy Operational, Technical And Functional Deficits And To Bring About The Current And Future Requirements. In Addition, The Installation Of Photovoltaic Systems Is Planned On All Roofs Of The Train Station. In Addition To The Modernization And Renovation Of The Subway Station, The Technical Upgrading Of The Tunnel Route Alte Heide Must Be Carried Out To The Current Technical Status. In Addition, The Costs Of The Technical Upgrading Of The Parking System Alte Heide Must Be Taken Into Account To The Current Technical Status As Part Of The Measure. Fire Protection Technology; Mounting Increase; Concrete Repair; Upgrading Platform And Platform Roofing; Preparatory Measures For Retrofitting Platform Doors; Installation Of Photovoltaic Systems; Modernization Of The Technical Building Equipment; Architectural Redesign Lock Floor; Marketing Offensive; Room Concept Surface With Expansion Of The Operating Rooms; Planning And Execution Are Carried Out Using The Building Inforamition Modeling (Bim). It Is Also A Bim2infrafm Project. The Execution Takes Place In The Stock And Under Ongoing Operation. Total Usable Area Gnf Train Station Gi Approx. 3,034 M².
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.