Tenders Are Invited For Hospital Facilities Construction Work-Construction, Finishing And Techniques Of The New Central Sterilization Department Of The East Limburg Hospital
Tenders Are Invited For Hospital Facilities Construction Work-Construction, Finishing And Techniques Of The New Central Sterilization Department Of The East Limburg Hospital
Hospital Facilities Construction Work-Construction, Finishing And Techniques Of The New Central Sterilization Department Of The East Limburg Hospital. The Contracting Authority Is Looking For A Main Contractor For The Construction, Finish And Techniques Of The New Central Sterilization Department Of The East Limburg Hospital. The Assignment Relates To Construction And Finish. Partial Architectural Demolition Of The Current Interior, Build New Design, Finish, Permanent Furniture, Sewerage, Environmental Construction, Site Device. The Assignment Relates To The Dry And Wet Techniques Including Electricity, Adjustments To The High Voltage, Low -Voltage Cabin, Distribution Boards, Cabling, Fire Detection, Access Control, Etc. Hvac. Disconnecting, Moving Parts Of The Current Installation, Building New Installation For The Csa Including Heat Pumps, Destruction Pipes, Air Groups, Building Management System Etc, Sanitary Facilities. Water Treatment With Ro Installations, Heat Pump Boilers, Distribution Of Water, Sanitary Installations. The Current Warehouse Space Is Set Up As A Central Sterilization Department. This Sterilization Department Has Workspaces In Iso Class 7. This Is Of Great Importance And Smooth Wall Finish. There Are Also A Few Administrative Classrooms, Construction Of A New Technical Room On The Roof, Making Facade And Roof Through, Construction Of A Lift Cooker And Placement Of A Passenger Lift. An English Courtyard Must Be Made On The Side Wall. Adjustments Are Requested To The Internal And External Sewer System. The Specific Devices For The Csa, As Well As The Various Types Of Working Islands, Are Part Of A Separate Government Assignment. This Assignment Will Be Completed In Parallel With A View To A Smooth Coordination Between The Two Contractors During The Construction Phase. The Assignment Will Be Described In Detail In The Second Phase Of The Placement Procedure, Being The Award Phase. Point Of Attention: The Project Must Be Carried Out In An Operational Hospital. The Contractor Issues A Project Manager Who Is Constantly Present To Coordinate The Cooperation Between The Various Techniques And Activities Of The Hospital. Hospital Activities Always Have Priority Over Work. Works That Cause Noise, Vibrations Or Dust Are Scheduled In Consultation With The Construction Management And Departments Involved And Can Be Stopped At The Request Of The Client And Being Replaced If These Operational Activities Hinder. If Necessary, Evening, Night Or Weekend Work Can Be Planned. The Estimated Value For The Realization Of The Assignment Here (Construction, Techniques, Completion And Fixed Furniture) Is +/- € 7,500,000.00 (Excluding Vat). The Project Comprises An Area Of Gross 2000 M² On Low -1 Excl. Technical Space On Roof, Outdoor Construction And Lift Cooker. There Is An Execution Period Of Up To 240 Calendar Days. Start Provided In August 2025.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.