Tenders Are Invited For Building Construction Work- Establishment Of A Biomass Firing And Biogas Preparation System At The Weißenfels Composting Plant Los 3: Building Construction For Biomass Firing System
Tenders Are Invited For Building Construction Work- Establishment Of A Biomass Firing And Biogas Preparation System At The Weißenfels Composting Plant Los 3: Building Construction For Biomass Firing System
Building Construction Work- Establishment Of A Biomass Firing And Biogas Preparation System At The Weißenfels Composting Plant Los 3: Building Construction For Biomass Firing System. Los 3: Building Construction For Biomass Firing System -------------------------------------- ---------------------------- 00 M Building Height Max. Height: 10.40 M Ok First (Pent Roof) Min. (Appendix 5) Sole: Reinforced Concrete Base Plate Layer Bag Or Plate Thickness According To The Static Requirement. The Reinforced Concrete Base Plate With Hard Stuff Scattering Of Hard Fabric A Is Too Smoothed Using Wing Smooths. The Required Flatness: +- 3 Mm To 1.50 M Built-In Parts Must Be Concreted In Accordance With Appendix 5- Trying Planning Hls. Consideration Of The Surface Loads According To -Breakthrough Planning Hls -Weight Information From Plan Supplies Bmfa (See Appendix 5). Execution Of The Sole In Two Concrete Levels. Wall Input Bearing: Back Wall Northeast: Approx. 6.00 M X 3.50 M (L X H) Executed As A Wooden Planks With U-Profiles On The Side Walls, From A Height Of 1.00 M Above The Gok Of The Push Floor Northwest: Approx. . L X H) Northeast Side: Approx. 16.40 M X 1.50 M (L X H) Southeast Side: Approx. 8.00 M X 1.50 M (L X H) Southwest Side: Approx. 10.80 M X 1.50 M (L X H) Facade: Trapezoidal Tract Cover With Steel Substructure Construction: Support Structure Made Of Steel Or Reinforced Concrete After Choosing The Statics To Be Placed On Reinforced Concrete Walls, Binder In Accordance With Static, Maximum Height: 1.0 M Load -Bearing And Stiffening Components Of The Front Bunker Roof: Trapezoidal Cover With Insulation Against Condensate Formation If Necessary With All -Round Attica. Tilt Approx. 3 ° Smoke Extraction System, Execution With Manual Opening Using An Electric Drive For Ventilation And As Pressure Relief Surfaces: Effective Opening Area 12 M². The Roof Is Accessible To Control, Maintenance And Repair. A Rope System And A Roof Climbing Manager Must Be Provided On The Roof. Gate: 1 Roller Door On The Southeastern Side: 3.50 M X 5.00 M (W X H) Doors: 3 Outer Doors As A Escape Door, Light Height 2.125 M 1 Interior Door, Light Height 2.125 M In T90 1 Interior Door, Light Height 2.125 M In T90 Access Stairs: Outside Lying Access Stairs Lightning Protection: Outer Lightning Protection Devices, Lightning Protection Class Ii The Scope Of Services Of The Present Tender Bmfa Building Construction Essentially Includes The Following Components: - Construction Site Device - Reinforced Concrete Work, - Execution Planning Indoor Application Design - Delivery, Production And Assembly Of The Steel Construction For The Hall Application Construction - Execution Planning, Delivery And Assembly The Facades And The Insulated Roof - Execution Planning, Delivery And Assembly Of The Math Light Strips With Partially Integrated Rwas Execution Planning, Delivery And Assembly Of The Gates And Tü
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.