Restoration Work - Hall 9 - Casco Restoration. Phase 1: Casco Restoration Former Train Shed Hall 9 O Explanation The Works Include Following Things: Restoration (Reinforcement) Of The Original Metal Frame Structures Cleaning And Restoration Of The Brickwork (Both Inside And Outside) Renovation Of The Roofing Incl. . Slop And Equipped With A Retaining Wall By Means Of Secanspalenwand Fully Dismantling The Garden Wall (Incl. Stockage And Recovery Of The Original Bricks) And Hermetically Re -Wall. Remediation Of The Soil Demolition Of The Remaining Outbuilding At The South Façade The Client Obtained A Heritage Premium In 2014 In Accordance With The Then Special Procedure For A Heritage Premium Cf. The Decision Of The Flemish Government Of 14 December 2001 Containing The Premium System For Restoration Work On Protected Monuments. For That Reason, Some Additional Requirements Are Set In The Selection Criteria That The Registration Must Meet. The Validity Period Of The Premium Was Extended Today Until 31 May 2025. To Prevent Further Decline Of The Hall, The Restoration Is Urgent. In A Later Phase, A Tender Will Follow For The New Interpretation And Re -Use Of The Hall. O Place Of The Central Workplaces Version - Hall 9 Werfplein Zn. (Hoek Werkhuizenstraat-Karel Schurmansstraat) 3010 Kessel-Lo O Mandatory Place Visit Friday January 10, 2025 At 10 Am
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.