Tenders Are Invited For Substation Equipment - Delivery Of 110 Kv Element Modules Involving The Equipment Of An Entire Substation

Tender Detail

92233734
81943-2025
Self-Funded
Tenders Are Invited For Substation Equipment - Delivery Of 110 Kv Element Modules Involving The Equipment Of An Entire Substation
NCB
Eastern Europe
Balkans,European Union,G20
10-03-2025

Work Detail

Substation Equipment - Delivery Of 110 Kv Element Modules Involving The Equipment Of An Entire Substation. The Contract Will Be Concluded For A Period Of 57 (Fifty -Seven) Months. Delivery Orders Under The Concluded Contract May Be Sent During The First 48 (Forty -Eight) Months From The Date Of Its Entry Into Force, Depending On The Specific Needs Of The Contracting Authority. The Contracting Authority Forecasts The Quantity For Delivery Of 3 (Three) Pieces Of Modules According To The Sbb (Single Busbar) Single Busbar Scheme With Three Connections; 3 (Three) Pieces Of Equipped Container With Module Management Equipment; 3 (Three) The Number Of Modules According To The H Single, Sectioned With A Circuit Breaker And Two Divisions, A Bruising System For Four Accessions And 3 (Three) Pieces Of Equipped Container With Module Management Equipment; 2 (Two) Number Of Modules Under The H Single, Sectioned With Two Divisions, A Four -Attachment Bruising System And 2 (Two) Pieces Of Equipped Container With Module Management Equipment; Preparation Of A Project For Installation Of The Respective Type Of Module; Foster Tests; Training Of Staff Of The Contracting Authority. The Installation, Maintenance And Operation Of The Delivered Facilities Will Be Carried Out By Representatives Of The Contracting Authority. The Contractor Must Organize Training Of 5 (Five) Specialists Of The Contracting Authority, To Such An Extent That They Can Fulfill The Obligations On The Installation, Maintenance And Operation Of The Delivered Facilities Without The Help Of The Contractor Or Its Representatives. The Training Should Be Conducted At The Manufacturer After Successfully Conducting Foster Tests. Functional Tests Are Conducted At The Manufacturer, In The Presence Of 4 (Four) Representatives Of The Contracting Authority, Before Delivery. The Deliveries Will Be Made After Submitting A Delivery Order By The Contracting Authority, Indicating A Specific Quantity And Place Of Delivery.

Key Value

Tender Value
1,08,78,000 - BGN

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail