Structural Shell Work - New Building Bitburger Str. 1 | Shell. The University Clinic Plans To Bring Its Dormitories To The Current Building Standard Through New Buildings And Renovations. In The Measure, The Nursing School At Bitburger Straße 1 Is To Be Demolished And Replaced By A 4 -Storey New Building + Relay Floor In Wooden Module Construction With 199 Residential Units And A Massive Basement With Underground Car Park. The Stairwells With The Elevator Shafts For Vertical Development Are Also To Be Massively Designed In Reinforced Concrete. The Performance Of The Shell Construction Union Comprises The Foundation Of The Building And The Underground Car Park Using A Floor Slab, Construction Of The Basement In A Reinforced Concrete Construction, Production Of The Reinforced Concrete Ceiling Above The Basement As Well As The Construction Of 2 Stairwells (Kg To 4) And 2 Elevator Shafts Also From Kg To 4. Og. Furthermore, Masonry Work Is Part Of The Advertised Service. Under The Base Plate Is To Be Laid By The Basic Drainage.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.