Transformers - 110/20 Kv Main Transformer 25 (31.5) Ch, Vatajankoski Sähköverkko Oy. Vatajankoski Sähköverkko Oy Acquires A New 117/21 Kv, 25 (31.5) Mva For The Main Transformer 110/20 Kv For The Substation In Kankaanpää. The Transformer Must Meet The Ecodesign Requirements Eu No 548/2014. The Offer Includes All Factory Commissioning Tests Required By Valid Standards. The Offer Includes: - The Three -Phase Transformer To Be Fitted In The Tender Documents, With Oils And Equipment, Installed On The Foundation For The Foundation. - Transformer Design And Manufacture - Transformer Test Test At The Supplier Factory - From The Transformer Transportation Supplier Factory To The Foundation Of The Substation (Transportation, Hazard Or Withdrawal And Import Costs) - The Transformer Installation - In Place Of The Transformer Expansion Tank Installation Wire Connections To The Extent That They Have Had To Be Opened Due To Transportation - Transformer Protection Tests To The Transformer Assistant Cabinet Or Directly Into The Subscriber System If The Auxiliary Lines Have Already Been Connected - All Of The Transformer Design, In Use And Maintenance Of The Transformer. Instructions And Drawings Are Drawn Up In Finnish And In Accordance With Sfs Standards. A Space For The Outgoing Cables Will Be Reserved For The Wiring Drawings Of The Auxiliary Circuits. The Connection And Measurement Drawings Are Also Provided In Dwg Format. A Binding Measurement Drawing Of The Transformer, Which Shows Eg. The Main Dimensions, The Location Of The Connector And The Cabinet, The Lifting Points, And The Locations, Dimensions And Substances Of The Main Circuits Are Delivered No Later Than 30.4.2026 Or As Agreed. Wiring Diagrams And Wiring Drawings Will Be Delivered No Later Than 30.4.2027 Or, As Agreed, Test Protocols, Finnish-Language Statements, And Installation, Operating And Maintenance Instructions Are Handed Over In Two Maped Series And One Series. Things In Electronic Form In Connection With Transformer Delivery Before Paying The Last Installment. The More Detailed Content Of The Procurement And The Technical Requirements For The Main Transformer Are Set Out In The Annexes Of This Invitation To Tender.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.