1) The Subject Of The Contract Is The Contractor To Perform Ongoing Maintenance, Measurements And Repairs Of Electrical Installations And Equipment At The Eco-Region Plant/Installation In Gotartów, Commune Kluczbork.2) The Subject Of The Contract Also Includes Technical Consultancy By The Contractor (Within The Time Limit Specified By The Employer) In The Scope Of: A. Improving The State Of Maintenance And Use Of Facilities Covered By The Subject Of The Contract; B. Operation, Construction And Expansion Of Electrical Installations As Well As The Foundation Of Machines And Devices; C. Assessment Of Technical States Of Operated Equipment And Electrical Installations; D. Analysis And Consulting In The Field Of Electricity Savings And Ongoing Control Of Minimization Of Fees Due To Reactive And Capacitive Energy And Preventing Their Growth. 3) The Subject Of The Contract Obliges The Contractor To Prepare And Present The Ordering Documents To The Contracting Authority From The Maintenance And Measurement Of Electrical Installations And Measurements Made In A Given Calendar Month. From The Repairs Carried Out, Which Is Obliged To Attach To The Receipt Reports Constituting An Attachment To The Contract. 4) The Documents Referred To In Point 3) Should Be Drawn Up On The Basis Of Applicable Regulations And Standards And Include: A) Object Data, B) List Of Persons Conducting Research, C) Scope Of Tests Performed, D) Legal Provisions And Norms, E ) List Of Measurement Results (In The Case Of Documents From The Examination Of The Results Statement), F) Judgment, G) Period Of Validity Of The Tests Carried Out (Inspection), H) Recommendations For How To Repair Defects In Measuring Documents (In Case Of Inspection General Examination Of The Inspection), I) Attachments : The Rights Of The Person Or Persons Performing The Review And The Current Calibration Certificate For The Devices And Tools Used (In The Case Of The Document With The Inspection Only The Rights Of The Person Or Persons Performing The Review) .5) To The Documents Referred To In Point 3) The Contractor Is Obliged To Attach: A) A Copy Of The Rights, Persons Or Persons Performing Measurements Certified With The Original. /And In Gotartów (Task 1) For The Entire Period Of The Contract, I.E. 12 Months From The Date Of Signing The Contract Is 120Rbh (Task 1) .7) The Lack Of Preparation And Presentation To The Contracting Authority Of The Set Of Documents Referred To In Point 3), 4) And 5) Will Constitute A Basis For Refusing To Sign A Reception Report On The Part Of The Ordering Party And The Ordering Partys Right, After A Prior Call For The Contractor To Submit A Set Of Documents, To Terminate The Contract In Accordance With § 12 Para. 1 Point 2 Of The Draft Agreement Constituting Annex 2 To Swz.8) During The Duration Of The Contract, The Employer Guarantees A Minimum Of 50 %, The Amount Of Man -Hours, Indicated In Point 6), Possible To Work During The Contract, Provided For The Performance Of The Repa
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.