1) The Subject Of The Contract Is: Revitalization Of The Park In Nawra For The Needs Of The Museum Of The Earthlings Families In Sczanie - Part I2) A Detailed Description Of The Subject Of The Contract (Opz) Specify: 2.1. Description Of Construction Works And The Requirements For Them Together With Design Documentation; 2.2. Technical Specification And Acceptance Of Construction Works (Stwiorb); 2.3. Opz Together With The Abovementioned The Documents Indicated In Point 4.1 And 4.2 Are Annex 8 To Swz, 2.4. The Proposed Provisions Of The Contract - Annex 9 To Swz. All Requirements Specified In The Documents Indicated Above Constitute Minimum Requirements, And Their Fulfillment Is Obligatory. Failure To Meet The Above The Minimum Requirements Will Result In The Rejection Of The Offer As Incompatible With The Terms Of The Contract Pursuant To Art. 226 Para. 1 Point 5 Of The Public Procurement Law.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.