1. The Subject Of The Order Is The Renovation Of A Part Of The Building With The Bid. The Renovation Will Be Carried Out On The Historic Part Of The Court Building In Hyżne. The Building Is Located On The Plot No. 3087/1 (The Scope Of Works Is Illustrated By Annex 1 And 2). 2. The Contracting Authority Has A Building Permit, On The Basis Of Which Works Are Also Carried Out On The Reconstructed Part Of The Court Building. The Roof Covering Will Be Replaced On The Part Covered By The Order. 3. As Part Of This Agreement, It Is Necessary To Perform, Among Others, The Peripheral Horizontal Insulation Of The External Walls Around The Part Of The Object Against Capillary Pull -Ups, B) Segmental Digging In The Foundation Walls, C) Formed Moisture Plasters Up To A Height Of At Least 50 Cm Above The Visible Moisture Line With Deepening. Fug In The Wall For About 2 Cm, Remove The Paint, Clean, - Drying The Walls Of The Building After Digging Up The Foundations And Cutting Wet Plasters Should Last Such A Amount Of Time Enabling The Walls To Achieve The Right Humidity, D) Visible Structural Cracks Should Be Repaired Using The Wall Sewing System Using The Wall Sewing System Special Austenical Steel Biosen -Steel Spiral Ailevas, E) Vertical Insulation Of Foundation Walls, F) Repair Of Cornices - For This Purpose The Mortar Should Be Used To Make Stucco Cores, If Necessary, You Should Make Reinforcement With Stainless Rods And Wires, G) Applying In Two Layers Of Plaster Renovation, H) Reproduction Of Virgin, I) Renovation Of Window Joinery, In The Event Of A Poor Condition Of Joinery, It Should Be Made As A Wooden Joinery While Maintaining The Current Divisions And Form Of Windows .J) Renovation And Reconstruction Of The Door Joinery. An Automatic D3 Door Leaf Opening System Has Been Designed To Enable The Use Of A Building For Disabled People, K) Reconstruction Of Window Grilles In The Basement, L) Replacement Of Lighting Fixtures Outside The Building, M) Renovation Or Reconstruction Of Wooden Elements Above The Main Entrance On The South -West Facade, N) Inspection And Clearance Of The Existing Rain System. Note! The Holes After Dismantled Windows And Doors During The Renovation Will Be Secured And Insulated By The Contractor. 4. The Works Should Be Carried Out In Accordance With: 1) Land Use Project. 2) An Architectural And Construction Project. 3) Technical (Executive) Project Of The Structural And Construction Industry. 4) A Preliminary Of Works. 5) Sstwiorb. 6) Technical Expertise Of The Structure And Building Elements. 7) A Program Of Renovation And Conservation Works Approved By Pwkz. Documents Must Be Considered A Total Of 5. The Bill Of Quantity Prepared For The Investment Task In Question Is Only An Auxiliary Material And Is Designed To Present The Amount Of Works. Possible Omissions In The Pre -City Do Not Authorize The Contractor To Seek Additional Remuneration. In The Event Of The Need To Perform Works Included In Any Part Of The W.W. Documentation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.