1. The Subject Of The Order Is The Construction Of A Small Retention Water Reservoir In Białobłocie. Source Of Co -Financing: Purpose: Improving Water Management By Building An Earth Pond On The 90/5 Plot, The Precinct Of Białobłocie, Commune Lipka. The Project Of The Project: Water Resources Management As Part Of The Sub -Measure Support For Investments Related To The Development, Modernization And Adaptation Of Agriculture And Forestry, I.E. Improvement Of Water Management, Including Fertilization And Use Of Pesticides. Rural Program For 2014 - 2020.3. Investment Scope: 1.1 Removal Of A Layer Of Fertile Soil - Humus, Using Bulldozers, Layer Thickness Up To 15 Cm With Assembly In The Pile. 1.2 Removal Made With Pitched Excavators. 1.4 Mixing With Caterpillar Bulbs. The Spoil Moved To The Adjacent Area Up To 70M1.5 Planting (Cleaning Cleanly) Surfaces Of The Slopes And Dna Of Excavations Made By Hand - Category I, Iii. Analogy: Planning Of The Slopes And The Adjacent Area. 1.6 Mixing With Caterpillar Bulbs Of Earth Masses Up To 10 M. Humus Of A Burdened Excavation. Disturbing Of The Fertile Soil At A Distance Of 70M.1.7 Thickening Of Embankments With Mechanical Compacts. Analogy: Rolling The Area For Sowing Grass Seed2.1 Decision Of The Joint. 2.2 Lower Road Layer At Gravel Surfaces, Manually Broken Aggregate, Layer Thickness After A Thickening Of 10 Cm. Analogy: Hardening Of The Area Around The Tank - Communication String, Between The Slopes. 2.3 Upper Layer Of The Road At Gravel Surfaces, Manually Broken Aggregate, Layer Thickness After A Thickening Of 12 Cm. Analogy: Hardening Of The Area Around The Tank - Communication Sequence, Between Slopes. 2.4 Departments With A Diameter And A Depth Of 0.50X0.50 M In The Ground Of Category I, Ii. Under Protective Plantings. 2.5 Subging Of Slopes In The Fertile Land. Sicking Of The Slopes And The Area Covered By The Planting. 2.6 Double Bands Made Of Fascine Spitzers With A Diameter Of 15+15 Cm In Cat. I, Ii Soils, Performance From The Shore. Strengthening The Shore On The Line Of Water. 2.7 As -Built Inventory Of The Pond.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.