1) Reconstruction Of The Bridge At Km 17+102 Poviat Road No. 1318K Szczucin - Sucha Grunt - Radwan On The Nieczczko Stream In Sutków. The Design Study Is To Include The Reconstruction Of The Existing Bridge Along With Access To The Nieczczko Stream Along The Poviat Road No. 1318K In Sutków. The Planned Investment Will Be Implemented Along The L-Class Class Hydrological And Hydraulic, The Width Of The Poviat Road Road On The Bridge And On The Access To The Bridge Should Be Adapted To The Parameters Of The L L Poviat Road Based On The Provisions Of The Regulation Of The Minister Of Infrastructure Of June 24, 2022 On Technical And Construction Provisions Regarding Public Roads (Dz. U. Of 2022, Item
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.