Tenders Are Invited For Engineering Services - Mpi For Structure And Dynamics Of The Matter Of Matter Hamburg Conversion And Renovation For Appeals, Tga
Tenders Are Invited For Engineering Services - Mpi For Structure And Dynamics Of The Matter Of Matter Hamburg Conversion And Renovation For Appeals, Tga
Engineering Services - Mpi For Structure And Dynamics Of The Matter Of Matter Hamburg Conversion And Renovation For Appeals, Tga. The Subject Of The Service To Be Awarded Are Engineering Services From The Area Of Elt- And Hkls Technology According To §§ 53 Ff. -Planck Institute For Structure And Dynamics Of The Matter In Hamburg (Mpsd) For The Following Plant Groups (Ag): Ag 1 Abwasser, Wasser- Und Gasanlagen.Ag 2 Heat Supply Systems, Ag 3 Air Technology Systems, Ag 4Starkstrom. .Ag 6 Förderlanlagen.Ag 8 Building Automation. The Expected Costs For The Aforementioned System Groups Are Approximately € 2.2 Million Net, According To An Initial Cost Estimate. The Estimated Total Construction Costs (Kg 200 To 700) Amount To Around € 3.0 Million Net. The Max Planck Institute For Structure And Dynamics Of The Matter Was Built From 2017 To 2021 As An Office Building With Chemical Laboratories, Physical Laser Measuring Rooms, Server Room, State-Of-The-Art Workshops And Seminar Areas On The Research Campus Hamburg-Bahrenfeld. The Total Area Nf 1-6 Of The Building Stock Is Approx. 6,200 M² (Bgf = 12,400 M²) In The Course Of Two New Advisors, Adjustments To Six Physical Measuring Rooms Are Necessary In Order To Meet The New Scientific Orientation. Research Is Aimed At In The Lowest Temperature Area And The Associated Highly Complex Scientific Requirements For The Areas Of Cold, Ventilation, Electrical Engineering And Building Automation. The Adaptation And Supplementary Work On The Existing Systems Must Be Carried Out When The Research Operation Is Ongoing. Planned Construction Start: 04/2026. Planned Handover To The User: 08/2027.Alle Reviews As Part Of The Planning Will Take Place As An Alternating 14 -Day As A Presence Event In Hamburg And As A Video Conference Time: Vss. 32 Months (Without Lph 9) Start: Vss. 05/2025 (After The Contract Was Distributed By The Vgv Procedure) End: Vss. 08/27.All Measures (Interims) That Are Necessary To Keep The Respective Building In Operation During The Construction Implementation Is To Be Planned. Execution Of Research Buildings Can Be Demonstrated. In The Planning And Construction Implementation, Not Only The Special Requirements With Regard To The Technical Systems, But Also The Work Processes That Are Common In Such Objects Must Be Taken Into Account. The Planning Must Be Carried Out At Least According To The Generally Recognized Rules Of Technology Also Include Economic And Energy Management Aspects And Criteria Of Sustainability. With Submission Of A Application For Participation, The Applicants Explain That They Are Able To Provide The Services Within The Period (See Ii.2.7) And In Particular, In Particular,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.