Coiled Turbine Drilling Services-Coiled Tubing Service For The Totpumpen Of Bohrung Endorf 2. The Health World Chiemgau Ag (Gwc) Operates A 4,300 M Deep High Pressure Bore In Bad Endorf To Promote Brine, Which Must Be Extensively Renovated. The Main Circumference Of The Work Is To Carry Out A Heavy Workover, With Plug & Abandonment Of The Deeper Part And To Open Up Flatter Horizons. Before The Drilling Space Is Prepared And Can Be Started With The Workover On The Hole, The Hole Must Be Pumped Dead. The Scope Of The Work On The Drilling Of The Hole Includes The Following:-Removing The Deposits In 2 7/8 Funding Tubing Up To A Depth Of Around 4060 M. It Is Expected That The Pipes Have Iron Sulfide Deposits. - Punching And Cutting Of The 2 7/8 Tubing At A Depth Of About 4046 M Md. - Evalging Of Severe Rinsing With A Density Of 2.1 S.G. Due To The 2 7/8 Tubing And The Ring Room 2 7/8 X 7 Casing For The Drilling Of The Bore.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.