Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
05-02-2025
Work Detail
Quotation are invited for Refurbishment/Chroming/ Polishing of High-Pressure Isolation Valves Stem 1032500473 1 ITEM-00001 TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORKL 2 STATION , JABEL ALI POWER STATION#DHGT251659264FLAYOUTINCELL1FALLO WOVERLA P1FBEHINDDOCUMENT1FHIDDEN0FLAYOUTINCELL 1TITLE: REFURBISHMENT/CHROMING/ POLISHING OF HIGH-PRESSURE ISOLATIONVALVE#S STEM, QTY-04 NO#B RIEF SCOPE OF WORK:REFURBISHMENT, POLISHING & CHROMING OF HIGH-PRESSURE ISOLATION VALVES STEMS, QTY-04 NOSTEM-1: ST 85 BYPASS INLET M IV- LENGTH-1720 MM, DIAMETER-84.61 MM STEAMMATERIAL A276-431 & DISC HOLDER 13CR SS KKS NO. 85LBA30AA001STEM-2: ST 85 BYPASS INLET MIV- LENGTH-1720 MM, DIAMETER-84.61 MM STEAMMATERIAL A276-431 & DISC HOLDER 13CR SS KKS NO.85LBA30AA011M ATERIALSTEM-3 AUX B 87 OUTLET MOV LENGTH-1605 MM, DIAMETER-74.96 MM STEMMATERIAL A182 F6A & DISC HOLDER 4 AU 13CR SS KKS NO.87LBA10AA003STEM-4 HRSG 82 FEED WATER CV INLET MOV- LENGTH-1120 MM, DIAMETER-69.7 MMMATERIAL A182 F6A KKS NO. 82HAC7 0AA001 DURATION OF WORK-15 DAYS AFTER COLLECTION OF STEMS FROM DEWADETAILED SCOPE OF WORK:Ø#AFTER GETTING THE RFX, SITE VISIT TO DEW A TO CHECK THE STEMCONDITIONS AND MEASUREMENTØ#CLEARLY UNDERSTAND THE SCOPE OF WORK WITH DEWA ENGINEERS IN CHARGE TOAVOID ANY CONFUS ION DURING THE WORK.Ø#AFTER PO, COLLECT &TRANSPORT THE STEM FROM DEWA L 2 STATION TOCONTRACTOR#S WORKSHOPØ#CLEANING OF THE STEM.Ø#ST EM MATERIAL CROSS VERIFY WITH PMIØ#TRUENESS CHECKING OF THE STEM. IF TRUENESS IS OK, PROCEED WITH THEBELOWØ#SUBMISSION OF VISUAL INS PECTION REPORT, DIMENSIONS OF THE STEMS ANDMETHOD OF STATEMENT OF REPAIR.Ø#CARRY OUT STANDARD REPAIR FOR THE DAMAGED AREAS OF STEM A S PERAPPROVED METHOD OF STATEMENT.Ø#MACHINING OF THE STEM AFTER REPAIRING UP TO THE EXACT DIMENSIONS ASMEASURED EARLIER.Ø#CHROMING A ND POLISHING STEM.Ø#PROPER LAPPING OF THE STEM BACK SEAT.Ø#CLEANING AND MACHINING OF THE STEM THREADS.Ø#REQUIRED NDE FOR THE REPAIRE D STEM. (DT, PRE HEAT, POST WELD HEATTREATMENT ETC. ( IF REQUIRED) .Ø#FINAL DIMENSIONS MEASUREMENT.Ø#ALL THE NDE REPORTS SHALL BE SU BMITTED TO DEWA WITH DELIVERY.Ø#ELECTRODE CERTIFICATE WHICH WAS USED FOR WELDING TO BE SUBMITTED TODEWA WITH DELIVERY.Ø#PACK THE STE M AND DELIVER AT DEWA L 2 STATION.Ø#SUBMITTING FULL REPAIR REPORT WITH THE STEP-BY-STEP REPAIR PHOTOS TODEWA REPRESENTATIVE.Ø#WARRAN TY FOR ONE YEAR.# SPECIAL NOTES / INSTRUCTIONS: REFURBISHMENT/CHROMING/ POLISHING OF HIGH-PRESSURE ISOLATION VALVE#S STEM, FOR L 2- MBR. For technical Quries write to ehab.bahour@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500318)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.