Tenders Are Invited For Replacement Of The Electrical Installation As Part Of The Task: Thermomodernization Of The M. Konarski School Complex At 55A Street In Warsaw - The Number Of Proceedings: 6/Zp/25.
Tenders Are Invited For Replacement Of The Electrical Installation As Part Of The Task: Thermomodernization Of The M. Konarski School Complex At 55A Street In Warsaw - The Number Of Proceedings: 6/Zp/25.
1) The Subject Of The Contract Is The Execution Of Construction Works Regarding The Replacement Of The Electrical Installation In The Building Of The School Complex At Ul. Okopowa 55A In Warsaw, Only In The Range Of The Following Rooms:- Ground Floor- Main Switchgear Room,- First Floor- Rooms No. 120, 121, 122, 123, 124, Mens Toilet, Toilet For The Disabled, Corridor,- 2Nd Floor- Rooms No. 217 , 218, 219, 220, 221, Mens Toilet, Staff Toilet, Corridor, - 3Rd Floor - Rooms No. 312, 315, Mens Toilet, Staff Toilet, Corridor And Supplying Power To Rooms With The Mentioned Electrical Installation On The Third Floor - No. 311, 313 And 314. Thebob Has Five Above -Ground Floors And One Underground. The Block Has An Irregular Shape Based On Rectangular Throws, Which Includes Three Main Segments, A Communication Connector And A Sports Hall. The Scope Of The Order Applies To Part Of The Main Segment And The Location Indicated Above. 2) The Subject Of The Contract Includes The Execution Of Construction Works In The Electrical And General Construction Industry - Only To The Extent Given Above In Item 1.3) A Detailed Description Of The Subject Of The Contract, Scope Of Work And Requirements Regarding The Performance And Receipt Of The Subject Of The Contract Are Determined By: 3.1. Design Documentation, Constituting Annex 10 To Swz: A) Executive Design, B) Technical Specification Of The Implementation And Acceptance Of Construction Works, C) The Bill Of Quantities (In Calculations For The Bill Of Quantities, The Descriptions Of The Rooms In Brackets Correspond To The Descriptions In The Design Documentation), 3.2. The Planned Provisions Of The Contract, Hereinafter Also Called The Model Contract - Constituting Annex 6 To Swz.4) The Works Will Be Carried Out In An Active Facility. The Contracting Authority Does Not Provide For Excluding The Facility From The Functioning Of The Facility, Also During The Holidays (July - August). The Organization Of Works Must Take Into Account The Specifics Of The Object, The Resulting Restrictions And Cannot Interfere With The Work Of The Facility. Particular Care Should Be Kept On Communication Routes And An Area Adjacent To The Works That Must Be Kept Clean. Before Starting The Work, It Should Be Presented To The Employer And The User (Director Of The Facility) Plan To Organize Works Ensuring The Least Nuisance For The Facility. Technical And Excessive Costs Of Performing The Contract. The Need To Coordinate The Activities Of Various Contractors Carrying Out Individual Parts Of The Order Could Threaten The Proper Performance Of The Contract, Because The Subject Of The Contract Is Homogeneous And It Is Not Possible To Separate Its Part. At The Same Time, The Warranty Granted After The Works Will Apply To The Entire Scope Of Work. In Addition, The Value Of The Contract Indicates That The Contractors From The Micro, Small And Medium -Sized Enterprises Sector May Apply For It. 6) In Accordance With The Content Of § 3 Para. 2 Of Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.