Description Of The Subject Of The Contract: Thermomodernization Of The Culture Center In Łowinku As Part Of The Order, It Is Planned To Thermomodernization Of The Existing Building Of The Culture Center With A Residential Part, Separated With A Boiler Room And A Fire Station Of The Tso Along With The Replacement Of Power Installations In The Field Of: Luminaires And Lightning Protection Installation. 709.00 M2-Storey Of The Storey 3.00-3.80 Months Gross Building Of The Building 2410.00 M3-Number Building 4.10 M- Roof Slope 2-3 ° Order 14 Cm With Heat Conduction Coefficient Λ = 0.033 - 435.07 M2 By Drawing Part Of The Room: 6; 7; 8; 9, 10, 11, 12; 13; 14; 15; 16 And 17 Along With The Execution Of Suspended Ceilings Gk In Pom. No. 17 And Suspended Coffered In Rooms: 6; 7; 8; 9, 10, 11, 12; 13; 14; 15; 16* Insulation Of The Flat Roof From The Outside From Styrofoam Plates With A Thickness Of 14 Cm With Heat Conduction Coefficient Λ = 0.033, In The Area Approx. 100.00 M2, The Flat Roofs Of The Tso Building According To Drawing Part, * Insulation Of Existing Chimneys Made Of Polystyrene Eps 070 038 Gr. 5 Cm With The Assembly Of New Chimney Hats, According To The Drawing Part, And The Development Of The Expansion Vessel.* 120Mm Gutters In Color And Fi 150Mm Drain Pipes. Square Gutters, Flashing And Forehead Of The Hood Made Of Galvanized Steel Sheet, Coated In Dark Gray / Anthracite. 15 Cm (Plaster, Painting With Silicone/Damp Paint - Color) Along With The Cornice Of The Entire Building Of The Culture Center With A Residential Part And Tso Łowinek,* Insulation Of Plinths From Styroduru Xps 200 032 Gr. 5 Cm, 160 M2 + Bucket Foil With Pvc Closing Strip (Below 80 M2 + Plinth Above The Ground 80 M2 - Finish Mosaic Plaster/Clinker 25X6 Cm (Graphite Color/Anthracite);* Stairs And External Platforms (Restoration Of Stairs To Concrete Apartments Demolished When Insulating The Plinth, The Entrance To The Boiler Room And Kitchen Facilities) Make As A Stairs From Architectural Concrete, Smooth, Flameful With The Dimensions. The Plasters Should Be Completed, Cover With Mesh And Adhesive Mortar To Apply Mosaic Plaster After Then, Use Bucket Foil From The Ground. Balustrades,* Band Around The Building - To Be Completed 50Cm, Where There Are No Platforms And External Stairs - Concrete Cube, On Sand Stabilized With Cement.* Squadrons (External Window Sills) Aluminum (Anthracite Color/Like Flashings) Protruding Beyond Plaster - External 4 Cm , Ended With Pvc Inserts In The Color Of The Window Sill.* Construction Joinery, Replacement Of Two Wooden Windows - Boiler Room Room And Replacement Of The Door To The Fuel Chop,* Replacement Of Lightning Protection Installations - Horizontal And Vertical Features - With A Possible Replacement Of The Rim After Diagnosing Damage (After Agreement. With Investor) .C) Modernization - Floor On The Ground* Insulation Of Some Floors On The Ground With Polystyrene Eps 100 038 Gr. 6 Cm By Formed Existing Floors, Demolition Of Floor And Arr
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.