Quotation Are Invited For Replacement Of Auxb 60 Burner Wall Tubes

Tender Detail

91967740
2332500327
Self-Funded
Quotation Are Invited For Replacement Of Auxb 60 Burner Wall Tubes
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
05-02-2025

Work Detail

Quotation Are Invited For Replacement Of Auxb 60 Burner Wall Tubes 1032500474 Repalce Auxb 60 Burner Wall T Replacement Of Auxb 60 Burner Wall Tubes.12 Tubes (Burner Wall Tube No. 43 To 48 <(>&<)> 54 To 59 From Rhs)The Bidder Shall Be #R# S 1 Item-00001 Technical And General Specification Of Outsourcing Work M Station, Jebelali Power Stationtitle: Replacement Of Auxb 60 Burner Wall T Ubes.A.#Quantity & Specification:·#12 Tubes (Burner Wall Tube No. 43 To 48 & 54 To 59 From Rhs)·#Size: - Od: 76.2 Mm; Thickness: 3.6 Mm·#Material: - Sa210 Gr.C (Installed Tube Material Is Sa210 Grade A1)B.#Duration:·#05 Daysc.#Schedule·#Work To Be Carried Out Duri Ng Auxb Outage Period In Between Jun#25 Tonov#25.·#02-Days Advance Notice Will Be Given.D.#Pre-Bid Site Inspection:·#The Contractor Shall Visit The Site And Make Themselves Fullyfamiliar With The Work Scope, Plant Access, Facilities, Complexities,Etc., Before Subm Itting The Bid. Dewa Will Not Accept Any Claim Forextras Beyond The Order Rates / Prices During And After The Execution Ofwork Ordered.E.#Qualification Of Bidder:·#The Bidder Shall Have Proven Experience For Similar Jobs And Shallsubmit Evidence.·#The Bidder Shall Be #R# Stamp Holder.F.#Scope Of Work:·#Mobilize Men/Equipment Within 02 Days Of Advance Notice.·#Obtain Ptw (Permit To Work) / Lc ( Line Clearance) From Dewa.·#The Following Documents To Be Submitted To Obtain Ptw,A.#Method Statementb.#Risk Assessment Of The Workc .#Toolbox Talk Report.·#Ensure Proper Isolation Of The Line & Valid Hwp Is Available.·#Ensure No Flammable Materials Near The Hot Wo Rk Area.·#Ensure Area Is Correctly Secured And Safe To Work On In All Respects.·#Conduct Site Survey And Safety Inspection To Assess The Workingenvironment.·#If The Working Environment Safe, You Can Proceed With The Followingsteps.·#Remove The Cladding Sheet & Ins Ulation.·#For Hot Work, Welding Booth To Be Provided To Prevent Welding Sparkor Cutting Materials Coming Out From Hot Work Area. Ens Ure To Provideenough Fire Extinguisher, Fire Blankets At Site.·#Protect The Nearby/Underneath Lines/Cables By Using Fire Blanket.·#I Dentify & Mark The Tubes With Dewa·#Cut The Tubes.·#Transport The Old Sample Tubes And New Spare Tubes To Contractorworkshop For Pre Fabrication.·#Bend The New Tubes As Per Old Sample Tubes.·#Return The Prefabricated Tubes.·#Prepare For Half Split Insert Repair Met Hod (Window Repair) And Weldthe Tubes·#Conduct Rt Of The Weld Joints (By Dewa)·#Weld The Tube Fins Back If It Were Removed.·#Conduct Dpt Of The Fins Weld Joints (By Dewa)·#Reinstall Rockwool Insulation, If Old Insulation Is Found Damaged,Then Same To Be Replaced.· #Reinstall Cladding Sheet, If Old Sheets Found Damaged, Then Same Tobe Replaced.·#Qualified Job Supervisor To Be Assigned For The Jo B.·#Qualified & Skilled Fabricators/Masons To Carry Out All The Jobs.·#Housekeeping And Disposal Of Waste Shall Be Done As Per Dewa Rules Ondaily Basis. Hazardous & Non-Hazardous To Be Separated.·#De-Mobilize Men And Equipment After Completion Of The Job.·#Complet Ion Report (Including Bending & Swaging) With Photos To Besubmitted To Dewa.·#All Tools & Tackles Are In Contractors Scope.·#Valid Test Certificates Of All Lifting Tools, Electrical Tools/Cablesand Gas Cylinders/Hoses To Be Submitted Before Start Of Work.·#Valid Calibration Certificate Of The Welding Machines To Be Submittedbefore Start Of Work.·#Wps, Pqr & Welder Qualification Certificates T O Be Submitted Beforestart Of Work.·#All Welding To Be Carried Out By Qualified Welder And As Per Wps Inaccordance With Requirements Of Asme Code.·#Dewa# Scope: -A.#Supply Of Spare Tube For Replacement.B.#Scaffoldingc.#Nde.D.#Suppl Y Of Rockwool & Cladding Sheet, I F Required.G.#Warranty·#The Warranty Period For The Work Shall Be 01 Year From The Date Ofcompletion Of Work Certified By Dewa.·#In Case Of Any Damage/Defect Of The Work Carried Out Under Thiscontract Within This Warranty Period, The Contractor Shall Attend Andcar Ry Out The Necessary Repair Work And Rectify The Defect Within Shortperiod.H.#General Terms & Conditions·#Contractor Shall Have Previous Work Experience For The Same Job·#Contractor Shall Submit Method Of Statement And Schedule Upon Receiptof Po.·#All Transporting And Required Equipment Should Be Arranged By Thecontractor. These Equipment#S Should Be Duly Tested And Certified By The3rd Party I Nspection Agency And The Certificates Should Be Produced Ondemand. Qualified Mechanics Should Be Provided.·#The Contractor Shall Vis It The Site And Make Themselves Fullyfamiliar With The Work Scope, Plant Access, Facilities, Complexities,Etc., Before Submitting Th E Bid. Dewa Will Not Accept Any Claim Forextras Beyond The Order Rates / Prices During And After The Execution Ofwork Ordered.·#The Contractor Shall Ensure Housekeeping On A Daily Basis And Thecontractor Shall Be Responsible For All Waste Material Disposal Todesig Nated Places.·#All Dewa Safety & Environment Policy, Rules And Regulation Shall Befollowed At Work Site During The Execution Of The Work. The Contractor#Sengineer Should Be Familiar With Safety Regulations While Working In Ahazardous Area.·#Scaffolding If Required Shall Be Arranged By Dewa.·#The Work Shall Be Executed Under Dewa Supervision And As Perquality/Schedule Requirement.·#Contractor#S Supervisor Shall Be Available At Site Throughout Theperiod Of Work.·#Dewa Will Arrange Necessary Ptw / Lc / Hwp From Operation, Che Micallab / Fire Department Clearances To Carry Out The Scope Of Work Underthis Contract.·#The Contractor Upon Receiving The Work Per Mit Shall First Ensure Asafe Working Condition.·#All The Persons Should Wear All The Required Ppe While At Work.·#All Material And T Ools Brought In Shall Be Declared At Power Stationsecurity Gate And The List Of These Items Shall Be Signed By Dewasecurity. The Cop Ies Of These Documents Shall Be Lodged With Dewaengineer In-Charge On Daily Basis. This Document Will Be The Basis Forthe Clearance (Gate Pass) To Take Them Out On Completion Of The Job.·#Service Air, Electricity And Water For Work At Dewa Site. It Is Theresponsi Bility Of The Contractor To Have His Own Arrangement Inextending The Electricity And Water Utility To His Places Of Workincluding Li Ghting. 1 Au Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332500327)/$Value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail