1 The Operation Includes The Reconstruction, Expansion And Superstructure Of The Existing Cloakroom Building Together With The Infrastructure, I.E. Sanitary Sewage Connection, Water Supply, External Electrical Installation, Communication, Communication, Parking Spaces And Internal Installations: Electrical, Water And Sewage, On Plot No. .1945/2, Obręb Płazów.Zakres Robót Obejmuje:- Roboty Rozbiórkowe (Dach, Strop, Stolarka Okienna I Drzwiowa, Ściany, Posadzki,Fundamenty)- Roboty Ziemne I Fundamenty,- Konstrukcja Nadziemia,- Konstrukcja Dachu Wraz Z Pokryciem,- Stolarka Outer,- Floors And Floors,- Internal Plasters And Cladding,- Internal Joinery,- Thermal Insulation Of External Partitions And Facades,- Band, Stairs, Hardening,- Terrain Fence,- Equipment,- Electrical Installations, Water. - Can. And C.O.- Connect Water - Can. Talking No. 2. Reconstruction, Expansion And Superstructure Of The Cloakroom Building Together With The Necessary Technical Infrastructure Of Narol. The Operation Includes The Reconstruction, Expansion And Superstructure Of The Existing Cloakroom Building Together With Infrastructure, I.E. Sanitary Sewage Connection, Water Supply, External Water Supply, Communication, Pitch Sprinklers And Internal Installations: Electrical, Water And Sewage, On The Plot No. 472/1, Narol-Miasto. , Floors, Foundations),- Earthworks And Foundations,- Unwilling Construction,- Roof Structure With Covering,- Outer Joinery,- Floors And Floors,- Internal Plasters And Cladding,- Internal Joinery,- Thermal Insulation Of External Partitions And Facades, - Band, Stairs, Hardening,- Water Supply To The Hydration System With A Deep Well,- Pitch Hydration System,- Regeneration Of The Pitch,- Equipment,- Electrical Installations, Water. - Can. And C.O.,- Connect Water - Kan. Talking No. 3. Renovation Of The Cloakroom Building Of The Leśnik Sports Club In Płazów. The Operation Includes The Renovation Of The Cloakroom Building On Plot No. 1179/14, Amphibians. The Work Of Works Includes:- Roof Renovation,- Renovation Of External Stairs,- Insulation Of Existing Foundation Walls,- Insulation Of External Walls, Facades,- Renovation Of The Interior Of The Cloakroom: Replacement Of Floor Layers, Cutting Ceramic Tiles, Dismantling Of Paneling, Execution Of Plaster, Plastering, Insulation Of Ceiling, Replacement Of Interior Doors, Laying New Floor And Wall Tiles, Painting Walls And Ceilings ,- New Bathroom Equipment. 2. A Detailed Description Of The Subject Of The Contract Is Determined By: 2.1. Design Documentation, Technical Specification Of The Execution And Acceptance Of Built Works And Bill Of Quantities. 2.2. The Planned Provisions Of The Contract Together With Attachments - Constituting Attachments To This Specification. The Entities Of Works Should Be Treated As Auxiliary Materials.