1. Order Name Construction Of Protected Apartments At Ul. Jagiellońska In Kluczbork. The Order In Question Is Carried Out In The Design And Build Formula. 2. The Order Includes The Design And Implementation Of Works Consisting In The Construction Of A Social Welfare Building With Two Apartments Protected Together With The Accompanying Technical Infrastructure. The Contracting Authority Described The Subject Of The Contract Using A Functional And Utility Program (Pfu) Constituting An Integral Part Of This Swz. The Order Includes The Design And Performance Of The N/W Works: - Plot Development; - Execution Of Installation Connections; - Construction Of Pavements, Terraces For Pedestrian Traffic; - Execution Of A Gravel Band Around The Building;- Location Of A Place For Collecting Solid Waste, With Waste Segregation In The Form Of A Dumpster Shelter;- Planting Low Greenery, Bushes And Lawns; - Building Building; - Execution Of Foundations, External And Internal Support Walls, Floors On The Ground, Roof Supporting Structure, Installation Of Windows And Doors; - Execution Of Internal Installations: Water And Sewage, Including Fittings; Heating, Electric And Teletechnical; - Finishing Works: Roof Covering, Thermal Insulation, Anti -Honing, Anti -Extinguishing And Acoustic Walls, Floors On The Ground And Roof; Internal And External Plasters, Cladding Of External And Internal Walls, Floor Cladding, Painting. 3. The Contractor Is Obliged To Perform All Necessary Design Studies Together With Necessary Opinions, Arrangements And Technical Conditions, Obtain All Arrangements, Permits, Permits, Decisions Necessary To Perform The Subject Of The Contract In Accordance With The Requirements Of The Ordering Party And The Terms Of The Contract And Perform Construction Works And Perform Construction Works And Perform Construction Works And Perform Construction Works And For The Contracting Authority, As Well As Construction Works. Obtain On Behalf Of And For The Customer Required Documents Enabling Commencing Use And Obtain On Behalf Of And For The Contracting Authority Permits For Used (If Required). 4. .U.2021 Item Other Arrangements, Permits And Approvals Related To The Design Of This Investment. 3). Obtaining A Final And Final Building Permit Decision. 4). The Scope Of Construction Works Includes All Preparatory, Earthworks, Construction And Construction Works, Installation, Finishing And Assembly Related To The Construction Of Protected Apartments Together With Technical Infrastructure And The Development Of The Part Of The Plot In Question. 5). All Costs Related To Design From Obtaining The Necessary Documents, Inventory Of The Necessary Expertise, Arrangements Of Implementation Conditions, Project Documentation Together With The Costs Of Obtaining A Building Permit And The Use Permit Are Borne By The Contractor. 6). Preparation Of As -Built Documentation And Submitting A Notification On The Completion Of Construction Works. 7). Cooperation With The Employer A
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.