The Material Scope Of The Project Includes: 1) The Implementation Of The Conceptual Design For The Entire Assumption Of The Park On Prosna. 2) Development Of Complete Design Documentation (Construction, Executive Project) For The Task Of The Park On Prosna - Area 1 And Obtaining Decisions, Opinions, Permits, Arrangements And Approvals Arising From The Scope Of The Project And The Acceptance Of Complete Documentation By The Contracting Authority. 3) Execution Of Construction Works Based On The Developed Project Documentation As Well As Appropriate Legal Provisions And Norms. The Revitalization Of The Park In Bolesławiec Should Ensure: A) Increasing The Attractiveness Of The Area By Protecting Against Degradation And Creation Park On Prosna; B) Restoration Of The Area To The Re-Use Of Residents Again; C) Creating A Cultural And Tourist Offer Using The Historical And Cultural Heritage Of Bolesławiec; D) Increasing The Availability Of The Educational And Tourist Offer Of Bolesławiec; E) Creating An Attractive Social Infrastructure, Including Places Activities, Rest For Various Groups Of Recipients (People With Disabilities, Young People, Mothers With Children, Elderly People, Etc.); By Designing And Performing Works: Construction Of A Pavement Providing Communication For Disabled People - Pavement Hardened With Paving Stones; Construction Of Safe Surface Under Playground; Performing Necessary Care Treatments On Existing Trees And Shrubs; Demolition Of The Facilities And Toilet Building Together With The Utilization Of Materials And The Addition Of New Toilets And Facilities*; Renovation Of The Facade Of The Social And Office Building Together With The Repair And Repair Of Drain Pipes Including Dehydration On Principle Of Frame Drainage; Making A Door Joinery In A Social Building; Renovation Of The Stage With A Wooden Roof; Execution Of A Bituminous Overlay On The Surface Under The Stage Which Will Also Be A Basketball Field; Installation Of New Baskets On The Basketball Pitch; Renovation Of Northern Stands; Assembly Playground Equipment; Gate Assembly; Assembly Of Benches; Installation Of Garbage Bins; Installation Of Bicycle Stands; Installation Of Information Boards With Regulations; Installation Of Two Pieces Of 5/2 Training Gates, Two Pieces Of Full -Scale Goals, Footballs 6/40 Meters And Two Shelters For Reserve Players-10-Person Sheds; Making A Pumptrack Track With A Length Of Min. 120 M Lighting And Poles - Ul. Sports Whole From The Old Mill To Kościuszki Street And All Existing Luminaires In The Park.*The Construction Of New Toilets And Facilities Is Understood As The Addition To The Existing Social And Office Building To The North Side Of The Facilities Building And Two Toilets With A Total Usable Area Of About 34 M2: One Womens And One Male. At Least A Womens Toilet Should Be Adapted To The Needs Of People With Disabilities. In The Mens Toilet Outside The Toilet Bowl, A Urinal Should Be Installed. Warm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.