Mitigation And Adaptation Actions To Climate Change To Taus And Castles.Review Of The Access To The Perafita Area And Improved And Partially New Layout To Existing Roads To Allow The Transport Of The New Tank And The Subsequent Maintenance, With A Long 300 M Long And Width Of 3.40 M. Execution With Mechanical Means And Contribution Of Materials Elected For Surface Drainage And Filming Layer. Prefabricated Water Tank Form With Excavation Of The Implantation With Mechanical Means To Bury 2 M The Vessel And 1 M Above Flush, 120 M3, 7.50 M In Diameter And 3 High. , With Pillarcentral, Foundation Base According To Plans, With Walls And Roof Formed With Concrete Prefabricated Elements According To Detail. Original. Subverse And Placement Of Two -Approved Fire Hydrants, Iconnected In Deposit With Pead 110 Pn10 With Special Pieces. The Slabs, Forming Underground Drainage Pipe Of 210 M Long Desvc D110, Included Excavation Of The Ditch And Filling At 60 Cm Depth.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.