Renewal And Improvement Of The Water Distribution Network At Teodor Miralles C/ Teodor.The Planned Works Consist Of: 1) Renewal Pipe Distribution Of Water On Teodor Miralles Street: New Canalization From Cal Peraire Until Passing The Junction Of The Clusa Path, 890 M Long, With High Density Polyethylene Tube Of High Density Diameter 200 Mm Pn16, Placed In A Ditch Excavated On The Sidewalk 1.10 M Deep And 0.60 M Wide, Protected And Surrounded By Sand. Removal Of The Existing Canalization On The Sidewalk, Of D200 Mm Fibrocement Tube In A Section Of Length 730 M Between The Church Street And The End Of The Canalization At The Nº61 Of The Teodor Miralles. It Will Be Transported To A Special Waste Landfill With Special Sacks, According To Current Regulations For Materials Containing Asbestos. Length, With High Density Polyethylene Tube 63 Mm Pn16, Placed In A Ditch Excavated On The Sidewalk 1.00 M Deep And 0.40 M Wide, Protected And Surrounded By Sand.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.