Construction Of Tourist Infrastructure At The Zek Lagoon In Radymniew Frames For Funding From The Polish Government Fund Order Order Strategic Investment Program The Project Of The Project Includes:- Preparation Of Complete Design Documentation (Construction Project, Executive Project, Technical Specifications Of The Implementation And Acceptance Of Works, Bill Of Quantities With Investor Costs, Geological Documentation- Geological Documentation- Engineering/In Cases Indicated In P.F. -U. Implementation Of The Investment Task Enabling The Execution Of Works Related To The Construction Of Tourist Infrastructure At The Zek Lagoon In Radymno;- Exercising Authors Supervision;- Execution Of Construction Works Consisting Of Construction Works Consisting In The Construction Of Tourist Infrastructure On The Zek Reservoir- Stage I;- Execution Of Construction Works Involving The Construction Of The Building Toilet With Internal Electrical, Water And Sewage Installation, With An External Emergency Electrical Installation And Hardening Of The Area On Journal Of Laws No. 456/40 And 2650/10 Rev. 0001 Radymno - In Accordance With The Developed Multi -Branch Design Documentation, Which Is In The Possession Of The Ordering Party And The Obtained Building Permit. Understanding No. 1 - Preparation, Based On A Functional And Utility Program No.: 2379, 2628, 2629, 2633, 2634, 2637, 2639, 2638, 2643/2, 2645/2, 2650/4, 2650/9, 2650/10, 2650/11, 2650/12, 2650, 13, 2650/14, 456/38, 456/39, 456/40, 460 In The Town Of Radymno (Annex No. 8A To Swz). Pursuing No. 2 - Execution, Based On The Design Documentation And Obtained Building Permits, Construction Works Consisting In The Construction Of Tourist Infrastructure At The Zek Reservoir - Stage I, On Plots No.: 2379, 2628, 2629, 2633, 2634, 2637, 2639, 2638, 2643/2, 2645/2, 2650/4, 2650/ 9, 2650/10, 2650/11, 2650/12, 2650.13, 2650/14, 456/38, 456/39, 456/40, 460 In Radymno (Annex No. 8B To Swz). Task No. 3 - Execution Of Construction Works Consisting In The Construction Of A Toilet Building With An Internal Electrical, Water And Sewage System, With An External Emergency Electrical Installation And Hardening Of The Area On Journal Of Laws No. 456/40 And 2650/10 0001 Radymno - In Accordance With The Developed Multi -Branch Design Documentation, Which Is In Possession Of The Ordering Party And The Obtained Building Permit (Annex No. 8C To Swz). As Part Of The Project, The Contractor Is Also Obliged To Set Up At Its Own Expense Informing About Financing (In Accordance With The Guidelines Referred To In §2, Paragraph 2, Item 34), And Assurances At Its Own Expense Full Geodetic Service Necessary To Implement The Subject Of The Contract. Attention! In Addition, In The Scope Of The Subject Of The Contract, It Is:- Obtaining Positive Opinions Of The State Fire Service, The State Labor Inspectorate, The State Sanitary Inspection Regarding The Compliance Of The Works Performed With Design Documentation And Meeting The Requirements Of F