Tenders Are Invited For Renovation That Increases The Energy Efficiency Of A Residential Building In Ścinawka Medium, Divided Into Parts

Tender Detail

91781328
PRiWT.271.1.2025
Self-Funded
Tenders Are Invited For Renovation That Increases The Energy Efficiency Of A Residential Building In Ścinawka Medium, Divided Into Parts
NCB
central europe
European Union
10-02-2025

Work Detail

Part 1. Modernization Of The Heat Source. 1) The Scope Of Work Includes: A) Modernization Of The Co And Dhw Installation, B) Replacement Of A Heat Source For A 30 Kw Ground Heat Pump (Performance Of The Lower Heat Source And Pump Assembly), C) Installation Of Photovoltaic Installations .2. A Detailed Description Of The Subject Of The Contract For Part 1 Is Specified In The Design Documentation And Bill Of Quantities - Constituting An Attachment To Swz. 2.1. The Contractor Should Familiarize Himself With The Entire Project And The Stwiorb, So That There Is No Discrepancy During The Implementation Of The Very Implementation Of The Object As To The Quality, Quantity As Well As The Technical Solutions Adopted And The Value Of The Entire Investment Specified In The Offer. The Contractor Should Familiarize Himself With The Object And Before Submitting The Offer To Become Familiar With The Task Of The Task. Any Doubts, Even If The Financial Effects Should Be Made By The Contractor At The Level Of The Cost Agreed. The Signing Of The Contract Is Ultimately Confirming The Adopted Provisions Contained In The Contract As Well As In Stwiorb And In The Project. No Changes Are Allowed During The Implementation Without The Prior Consent Of The Investor And The Supervision Inspector. The Contractor May Not Use Errors Or Simplifications In The Contract, And Should Immediately Notify The Investor And Inspector Who Can Make Appropriate Changes Or Corrections. All Robots And Materials Delivered Will Be In Line With The Tender Documentation And Stwiorb. The Data Specified In The Order Documents And In Stwiorb Will Be Considered To Be Target Values, From Which Deviations Under A Specific Tolerance Range Are Permissible. 2.2. All Requirements Specified In The Documents Indicated Above Constitute Minimum Requirements, And Their Fulfillment Is Obligatory. Failure To Meet The Above The Minimum Requirements Will Result In The Rejection Of The Offer As Incompatible With The Terms Of The Contract Pursuant To Art. 226 Para. 1 Point 5 Of The Pzp.2.3 Act. The Cost Of The Contractor Is Also: 1) Drawing Up A Safety And Health Protection Plan, In Accordance With The Requirements Of The Act Of 7 July 1994 Construction Law; 2) Preparing Geodetic And As -Built Documentation, 3) Ensuring On Your Own Geodetic Service During The Implementation Of The Subject Of The Contract; 4 ) Execution And Agreement With The Competent Authority Of The Geological Works Project. 5) Making As -Built Documentation For Photovoltaic Installation For Fire Collection 3. Additional Obligations Of The Contractor. For Additional Obligations Of The Contractor, All Preparatory And Cleaning Works, Development Of The Construction Site, Construction Facilities (E.G. Repairs, Water, Electricity, Temporary Fence, Construction Supervision, Etc.). 3.1. 3.1. This Specification Describes The Subject Of The Contract In An Exhaustive And Complete Way. However, In Order To Better Read The Subject Of The Contract, The Employer

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail