Tenders Are Invited For Geothermal Power Station Construction Work – New Construction Of An Integrated Control Center In Ortenau, Geothermal Energy - Geothermal Probes
Tenders Are Invited For Geothermal Power Station Construction Work – New Construction Of An Integrated Control Center In Ortenau, Geothermal Energy - Geothermal Probes
Geothermal Power Station Construction Work – New Construction Of An Integrated Control Center In Ortenau, Geothermal Energy - Geothermal Probes. It Is Planned To Heat And Cool The Above-Mentioned New Building Using Geothermal Probes. For This Purpose, The Construction Of A Geothermal Probe Field With A Total Of 10 Geothermal Probes Is Planned. The Subject Of This Tender Is The Following Services: 1St Construction Phase - Construction Of 9 Geothermal Probes Divided Into Two Sub-Areas 2Nd Construction Phase - Laying Of Horizontal Connecting Lines Including Connection Of The Exploratory Borehole Ews01 - Delivery And Installation Of A Distribution Shaft Including Connection Of The Horizontal Connecting Lines 3Rd Construction Phase - Laying Of Collecting Pipes In Trenches Created On Site Between The Distributor And The Building, Including Connection To The Distributor And Introduction Into The Basement Floor Of The New Building 4Th Construction Phase - Flushing, Venting And Filling The Entire Sod System With A Heat Transfer Medium - Hydraulic Balancing Of The Geothermal Probe System
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.