The Subject Of The Order Are Construction Works Consisting In The Expansion Of The Primary School In Butryny In The Design And Build Formula: Part I - Expansion Of The Primary School In Butryny In The Design And Build Formula. Design And Construction Works Include In Particular: • Modernization By Expanding The Existing Building With A Development Area Of Approx. . 342 M2, Number Of Floors: 2 Above-Ground, • Creation Of Three Classrooms, Sanitary Facilities. (Womens, Mens And Disabled Toilets) On Each Floor, Common Room, Staircases, Auxiliary Rooms, Communication Routes: Corridor, Staircases, • Plan A Communication System Connecting The School With The Planned Construction Of The Gymnasium, • Visible For Disabled People, • Replacement Heating Sources For The Increased Area (Boiler Room In The Existing Part Of The School), • Building Equipped With The Following Installations: Fire Hydrant, Water, Telecommunications, Electricity, Sanitary Installations Heating, Mechanical Ventilation With An Adapted Power Connection And A Fire Protection Switch, • Water Supply And Sewage Connection And Reconstruction Of The Conflicting Sanitary Sewage Network, • A Fire Road Ending With A Parking Lot With A Parking Lot With A Crushed Stone Surface, • Landscaping (Concrete Pedestrian Paths, Greenery ).A Detailed Description Of The Rooms And Materials Used Is Included In The Architectural And Construction Concept And In The Program Functional And Utilitarian.• Development Of A Conceptual Design For The Approval Of The Ordering Party - 2 Sets, • Preparation Of An Inventory Of The Existing Building - 2 Copies, • Development Of A Complete Construction Design (Plot Or Area Development Design, Architectural And Construction Design), Technical Design, Executive Design And Opinions, Arrangements, Permits And Other Documents Referred To In The Act Of July 7, 1994, Construction Law (Journal Of Laws Laws Of 2024, Item 725) And Executive Works Together With The Necessary Industries, Taking Into Account The Reconstruction Of Existing Drainage Facilities If Required And Taking Into Account, In The Event Of A Collision, The Implementation Of Possible Relocations/Protective Pipes/Construction Of New Sections Of Existing Infrastructure, Culverts In Accordance With The Conditions Issued By The Owner Or The Manager Of The Colliding Network – 5 Copies, • Preparation Of All Necessary Documents Required To Obtain Appropriate Decisions, Arrangements And Permits Enabling The Conduct Of Construction Works And Others If Required By Law, • Environmental Decision Conditions (Dśu) - If Necessary, • Preparation Of A Situational And Height Map For Design Purposes. The Map For Design Purposes Must Contain The Established Boundaries Of Cadastral Plots With The Accuracy Appropriate To The Field Details Of Group I, The Location Of Trees And Shrubs, Other Devices And Structures, And Absolutely The Entire Underground Technical Infrastructure, • Development Of Detailed Technical Specifications For The