Well-Plugging Services - Blocking Of Deep Drillings For Mining Purposes By 2025. A Detailed Description Of The Tasks Can Be Found In The Tender Documentation. Safeguarding And Sealing Of 3 Non-Usable Deep Drillings (Hydrocarbon Wells) For Mining Purposes, In Accordance With The Liquidation Plans That Are Part Of The Public Procurement Documentation, With The Well Repair Equipment And Personnel Specified In The Technical Documentation. Provision Of The Well Work Fluids Necessary For Carrying Out The Well Works, Disposal Of The Fluids Flushed Out Of The Well, Hazardous Waste, And Scrap Iron Materials. During The Well Work, A Total Of 5 Cement Plugs, 1 Pressure Cement Plug, 1 Cement Dam And 1 Placement Of Liner Plug, . During The Construction Of The Wells, Gas-Containing Layers Were Traversed In All 3 Deep Drillings. Preparation And Strengthening Of Access Routes For The Placement Of The Well Repair Equipment, Addition Of Foundations For The Placement Of The Well Repair Equipment. After The Completion Of The Operations, The Restoration Of The Access Roads And Foundations To Their Natural Environmental, Original State. Quantitative Deviation: Securing And Sealing Off A Maximum Of 1 Further Unusable, Unused Deep Drilling For Mining Purposes (Hydrocarbon Well) In Accordance With The Liquidation Plans Included In The Public Procurement Documentation, As Specified In The Technical Documentation. During The Well Work, A Maximum Of 1 Cement Plug, 1 Sectioning Operation, 1 Cement Dam And 1 Pressure Cement Plug, As Well As The Use Of Cool Tubing 1 Time, Are Required For A Maximum Of 1 Well.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.