Tenders Are Invited For Acting As A Project Engineer During Geological Works Aimed At Drilling An Exploration And Appraisal Well For Legnickie Pole Gt-1 Thermal Waters In The Town Of Legnickie Pole
Tenders Are Invited For Acting As A Project Engineer During Geological Works Aimed At Drilling An Exploration And Appraisal Well For Legnickie Pole Gt-1 Thermal Waters In The Town Of Legnickie Pole
1. Acting As The Project Engineer During The Implementation Of Geological Works Related To The Drilling Of The Legnickie Pole Gt-1 Thermal Water Exploration Well In Legnickie Pole Includes:2. Coordination And Ongoing Monitoring Of The Progress Of Works Related To The Implementation Of Geological Works, Including: A. Exercising Comprehensive Technical And Geological Supervision At Every Stage Of Drilling Work (Preparatory Work, Installation Of Equipment, Drilling, Deposit Tests, Dismantling And Land Reclamation) B. Inspection Of Compliance Of The Work Performed With The Approved Geological Works Designc. Development Of Minimum Technical Requirements For The Tender Procedure Aimed At Selecting A Contractor For Drilling Works. Preparation Of Materials And Participation In The Settlement Of Drilling Works Performed By The Contractor And Confirmation Of Actual Performance. Control Of Work Progress And Compliance With The Material And Financial Schedulef. Control Of The Financial Discipline Of The Project And Support Of The Ordering Party In The Scope Of Substantive Justification Regarding The Implementation Of The Investment During The Settlement Of Works With The National Fund For Environmental Protection, Preparation Of The Content Of Documents In This Scope. Verification And Possible Update Of The Specifications Of The Terms Of The Contract H. Checking And Verifying All Technical Documentation And Permits Required During The Implementation Of The Contract I. Preparing Weekly Reports On The Progress Of Work During The Implementation Of The Contract.2. Exercising 24-Hour Geological Supervision During The Performance Of All Works And Works Specified In The Geological Works Project For The Construction Of The Legnickie Pole Gt-1 Thermal Water Exploration And Appraisal Well In Legnickie Pole. Geological Supervision Is Performed By A Person With Professional Qualifications Specified In Art. 50 Point 2 Section 4 Pgg, I.E. In Category Iv (Exploration And Identification Of Groundwater Resources, Including Medicinal Waters, Thermal Waters And Brines, Determining Hydrogeological Conditions Related To The Intended: Carrying Out Drainage For The Purpose Of Extracting Minerals, Injecting Water Into The Rock Mass, Carrying Out Construction Drainage Through Drilling Holes, Carrying Out Projects That May Have A Negative Impact On Groundwater, Including Causing Its Pollution, Underground Storage Of Substances Without Tanks Or Underground Storage Of Waste, Storage Of Waste On The Surface, Establishment Of Protective Areas Of Groundwater Reservoirs, Termination Or Change Of The Drainage Level Of Liquidated Mining Plants, And Carrying Out And Documenting Geological Works In Order To Use The Earths Heat, As Well As Designing And Constructing Observation Wells) 3 . Exercising 24-Hour Drilling Supervision Over The Contractor Of The Geothermal Well Of The Legnickie Pole Thermal Water Exploration And Appraisal Well. Gt-1 In Legnickie Pole, Including: A. Providing Advice On
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.