The Subject Of The Order Includes The Construction Of A Sanitary Sewage System In A Gravity-Pressure System In The Entire Town Of Drwinia, Including The Integration Of The Designed Network Into The Existing Sanitary Sewage Network In Dziewin. The Planned Sanitary Sewage Network Will Be Connected To The Existing Infrastructure In The Town Of Dziewin Within The Scope Of A Municipal Public Road. The Sanitary Sewage Network Was Designed Mainly In Road Lanes Of Public And Internal Roads. The Construction Of The Sanitary Sewage Network Included The Construction Of Sewage Reaches Constituting An Element Of The Main Network. Four Sewage Pumping Stations And One Pneumatic Pumping Station Were Designed. The Task Includes The Execution Of 3 Transverse Crossings Through A Public Provincial Road. The Total Planned Length Of The Sewage Network Is: 14.1406 Km. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 Description Of The Subject Of The Order And Design Documentation Constituting Annexes To The Swz.. Before Signing The Contract, The Contractor, With At Which The Contract Will Be Signed Is Obliged To Provide The Ordering Party With An Offer Cost Estimate. The Contractor, In Consultation With The Ordering Party, Will Prepare And Will Submit A Material And Financial Schedule For The Implementation Of The Subject Of The Order No Later Than On The Date Of Conclusion Of The Contract. Introducing Changes To The Schedule Will Not Be Treated As An Amendment To The Contract And Will Not Require The Conclusion Of An Annex To The Contract. The Ordering Party Reserves The Right To Introduce Comments To The Hrrf. Manufacturers Names Or Trademarks Used In The Documentation Are Used Only To Specify The Subject Of The Order And To Define Technical And Functional Standards As Well As To Define Quality And Technological Standards. The Ordering Party Allows The Offer Of Products That Are Not Inferior In Terms Of Quality And Technical Parameters To The Products Specified By The Manufacturers Names, Provided That The Offered Products Have Technical And Quality Parameters At Least The Same Or Better Than The Products Specified By The Manufacturers Names In The Documentation. Requirements Referred To In Referred To In Art. 95 Pzp.1. Because The Implementation Of This Order Must Be Carried Out By Performing Activities Under The Conditions Specified In Art. 22 § 1 Of The Act Of June 26, 1974, Labor Code - For The Contractor Or Subcontractor, At The Place And Time Indicated By The Contractor Or Subcontractor - The Ordering Party, In Accordance With Art. 95 Section 1 Of The Public Procurement Law Requires The Contractor Or Subcontractor To Employ Persons Performing Activities Falling Within The So-Called Direct Costs Based On The Employment Relationship. This Requirement Applies To Persons Who Perform Activities Directly Related To The Performance Of Construction Works Covered By The Subject Of The Contract, I.E. The So-Called Manual Workers, In Particula
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.