The Contractor Shall Supply All Necessary Materials, Labour, Equipment, Expertise, Supervision, And Any Incidentals To Complete The Work In Accordance With The Specifications.- Clearing- Reclamation Of Cold Mix Surface- Common Excavation- Borrow Excavation – Contractor Supplied- Woven Geotextile – Supply And Install- Erosion Control Devices – Supply And Install- Preparing Subgrade Surface (First Layer)- Granular Base Course (Des. 2 Cl. 25) (280Mm Thick)- Asphalt Concrete Pavement Mix Type M1, Pg 52-34 (120Mm Thick)- Culvert Removal And Installation- Paving Of Approaches- Fencing- Signs And Guideposts- Supply Paint And Painting- Gravel Surfacing (Des. 4 Cl 25)- Topsoil Placement- Broadcast Seeding
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.