Electricity Distribution And Control Apparatus – Veeb - Pienjännitekeskukset. Vantaan Energia Oys Goal Is Fossil-Free Energy Production By 2026 And Carbon-Negative Energy Production By 2030. As Part Of The Strategy, Vantaan Energia Oy Is Building New District Heating Production Capacity In The Martinlaakso Power Plant Area In Vantaa. The New Capacity Consists Of A 60 Mw Hot Water Electric Boiler, A 15,000 M3 District Heating Battery And The Necessary Auxiliary Equipment And Systems. The Project Is Named The Veeb Project. The New Capacity To Be Built Is To Be Put Into Commercial Use In The Fall Of 2025. This Purchase Includes 2 Low-Voltage Substations. One Center 400V/1250A And The Other 400V/250A. The 1250A Center Contains An Approx. 450Kw Motor Output With A Circuit Breaker. The Tentative Delivery Date Is 04/2025.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.