The Subject Of The Contract Is A Framework Agreement For The Rental And Installation Of High-Flow Pumps And Accessories Such As Control Cabinets, Piping, Generating Sets, Fuel Tanks, Etc. During Periods Of Water Scarcity Or Flooding, These Will Be Placed At The Locks Of The Albert Canal And Other Flemish Waterways And Structures (Kattendijkdok, Etc.). These Periods Are Most Likely In The Period From June To June. October For Water Scarcity. The Minimum Deployment Period Of The Complete Pump Configuration Per Location Is 14 Calendar Days. The Tenderer Must Organize Himself In Such A Way That, After Receiving A Service Order, He Can Complete The Entire Process Up To And Including Can Guarantee The Installation And Commissioning Of The Installation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.