Natural Gas – Nové Sedlo – Drahonice – Supply Of Natural Gas 2025–2029 Ii. The Subject Of The Public Contract Is The Conclusion Of A Framework Agreement With One Selected Supplier For The Supply Of Natural Gas In The Expected Volume Of 120,000 M3/Year For The Gas Boiler Room Iii. Category With The Highest Total Thermal Output Of 486.4 Kw. The Supply Will Include The Free Installation, Operation And Maintenance Of The Fuel System Consisting Of An Evaporation Station And A Liquefied Natural Gas Storage Tank With A Minimum Volume Of 45 M3, Which Will Be Used As A Source Of Heating Medium. The Fuel Management Will Be Connected To The Existing Pipe Distribution Laid In The Ground, Which Is Led To The Heel Of The Boiler Room And Is Connected To The Technological Equipment Of The Boiler Room. Another Part Of The Delivery Will Be Free Disposal Of All Generated Waste And Documenting The Properties Of All Components And Materials Used, Including The Supplied Natural Gas.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.