Comprehensive Supply Of High-Methane Natural Gas Type E (Including Delivery And Provision Of Distribution Services) To The Facilities Of The School Complex No. 1. Stanisław Staszic In Olkusz (Annex 1 - Description Of Consumption Points) With A Total Volume Of 1,106,005 Kwh In The Period From January 1, 2025 To December 31, 2025. Facility 1: Zs No. 1 At Ul. Górnicza 12:• Point Number: 8018590365500000018758• Consumption Point: Boiler 2 Pcs. X 252 Kw• Orcs: Orcs030024• Tariff Group: W-5• Osd Group: W-5.1• Pressure Not Lower Than: 1.60 Kpa• Contracted Power: 347Kwh • Expected Gas Consumption – 526,751 Kwh (46,637 M3),• Current Seller: Pgnig• Dso: Polska Spółka Gazownictwa Sp. Z O.O., Zabrze Branch. Facility 2: Practical Education Center At Ul. Legionów Polskich 1:• Point Number: 8018590365500000051861• Intake Point: Boiler 2 Pcs. X 105 Kw• Orcs: Orcs030024• Tariff Group: W-5• Dso Group: W-5.1• Pressure Not Lower Than: 1.60 Kpa• Contracted Power: Up To 187 Kwh/H• Expected Gas Consumption – 418,685 Kwh (37,073 M3).• Current Seller: Pgnig• Dso: Polska Spółka Gazownictwa Sp. Z O.O., Zabrze Branch. Facility 3: Zs No. 1 At Ul. Górnicza 14:• Point Number: 8018590365500011400269• Consumption Point: 90 Kw Boiler• Orcs: Orcs030024• Tariff Group: W-5• Osd Group: W-5.1• Pressure Not Lower Than: 1.60 Kpa• Contracted Power: Up To 111 Kwh/H • Expected Gas Consumption – 160,569 Kwh (14,211 M3), • Current Seller: Pgnig• Dso: Polska Spółka Gazownictwa Sp. Z O.O., Zabrze Branch. In The Event Of Extension Of Tariff Protection Until 2025, The Ordering Party Expects The Application Of A Unit Price For The Supply Of Gas Fuel In Accordance With The Regulations Contained In The Act. Such A Declaration Was Submitted To The Current Contractor. For The Purposes Of These Proceedings, The Ordering Party Assumed The Expected Consumption Of Natural Gas Over A Period Of 12 Months. The Indicated Consumption Is Indicative Only, Used To Compare Offers And In No Case Constitutes An Obligation On The Part Of The Ordering Party To Purchase Natural Gas In The Specified Quantity. The Contractor Will Not Be Entitled To Any Claim Due To The Ordering Partys Failure To Collect The Estimated Amount Of Natural Gas. Settlement Of Liabilities Arising From The Sale Of Natural Gas Will Take Place According To The Readings Of Measurement Systems. For All Consumption Points, The Current Comprehensive Contracts Have Been Concluded For A Fixed Period Until December 31, 2024. The Contractor Undertakes To Carry Out The Procedure For Changing The Natural Gas Supplier. The Contractor Will Inform The Current Dso No Later Than 21 Days Before The Commencement Of The Order Execution About The Conclusion Of A Comprehensive Agreement With The New Supplier. The Condition For Commencement Of Natural Gas Supplies On The Indicated Date Is The Successful Completion Of The Supplier Change Procedure. Exemption From Excise Duty In Accordance With Art. 31B. Paragraph 2 Of The Excise Duty Act - Entities Of The Education Sy
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.