Construction Work – Renovation Of The Millennium Pavilion (Again). Renovation Of The Millennium Pavilion (Hereinafter: Project) As Part Of The Construction Contract. Request For Tenders By The Ministry Of Human Resources Iii/111-3/2020. Will Receive Budget Support No. Continuation Of Item Ii.1.4) / Bt-24 (Ted-Version Item 2.1): - Design Of A Fire Alarm And Intrusion Alarm System (Installation Of Intelligent Optical Smoke Detectors – 68 Units; Design Of Sound And Light Alarms – 18 Units; Design Of Indoor Motion Detectors – 14 Units) - Design Of It Network And Ip Camera System (Installation Of Wall Cable - 7500 M; Installation Of Optical Cable - 100 M; Installation Of Outdoor Ip Tube Camera - 12) - Design Of Access System (Installation Of Electric Lock Cable - 75 M; Installation Of Proximity Cards - 100) - Design Of Audiovisual And Control Technology Systems (In Terms Of Wall And Floor Connection Surfaces) - Installation Of Elevators (Installation Of A 300 Kg Freight Elevator And A (675 Kg Or 9-Person) Passenger Elevator) - Placement Of Indoor Information And Control Signs (Placement Of A Wall, Emergency Information Sign) - Tactile Signals And Creation Of Guide Lanes (Creation Of A Guide Lane Indoors) - Design Of Faience And Equipment For Water Blocks - Creation Of Barrier-Free Access For The Hearing And Visually Impaired (Flexible Induction Sheet - 1 Pc.; Tester Device For Checking The Operation Of Induction Devices - 1 Pc) - Gardening And Landscaping Works (Cutting Down Trees That Become Dangerous - 10 Pcs; Clearing The Part Of The Plot Remaining As A Forest Area - 15 M3) - Placement Of Edging, Stairs And Retaining Walls (Creating Edging, Stairs And Retaining Wall Construction Mirrors - 521 .05 M2; Fixing Decking To Closed Section - 1280 Pcs) - Paving Construction Works (Laying Concrete Slab - 1094 M2; Laying Geotextile Filter-Separation Layer - 66 M2) - Installation Of Garden Decorative Elements (Establishment Of Light Structural Wrought Iron Railing - 21 Fm) - Construction Of Automatic Irrigation System (For Intensively Maintained Vegetation With Mature Soil - 858 M2; For Intensively Maintained Lawn With Mature Soil - 610 M2) - Superstructure Works (Construction Of Paving Stones - 1847.6 M2; Construction Of Plant Retaining Wall - 193 M) - Traffic Engineering Works (Making White Pavement Markings - 8, 5 M2; Installation Of A Signpost With A Concrete Base - 5 Pcs) - Sewage And Rainwater Drainage Works (Digging And Demolition Of Working Trenches - 1795 M2; Installation Of Kg-Pvc Pipe – 179.5 M) - Substructure Works (Making And Compacting Road Mirror – 1989.6 M2; Making Sand Gravel Soil Improvement/Frost Protection Layer – 497.4 M3) The Data Described Above Are Informative, The Detailed Technical Description It Is Contained In The Public Procurement Documents And Their Annexes (Especially Technical Description And Unpriced Budget). Tenderer 321/2015. (X.30.) On The Basis Of Paragraph (3) Of § 46 Of The Government Decree, It Is Established That If A Sufficiently Precise And Comprehensible Description Of The Subject Of The Public Procurement Made It Necessary, Then In The Invitation And The Doc.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.