Marine Equipment – Seadragon. The Procurement Process For The Lars System Is Divided Into Two Separate Phases. The Requirements Must Be Met In Accordance With The Service Descriptions Mentioned Under Point 3. Specifically, The Following Components Will Be Part Of The Offer: - Part 1 (Lars Study): The First Phase Focuses On The Technical Design Of The Lars And Requires The Submission Of Comprehensive Documentation, Including Full Mechanical Design Files, Electrical Schematics, Component Lists As Well As The Usual Mechanical Stress Analysis. - Part 2 (Lars Manufacturing According To Study): The Second Phase Includes The Manufacturing And Adaptation Of The Lars To The Ups To Ensure Seamless Integration Into The Operational Requirements And Specifications Of The Vehicle. This Phase Includes Assembly, Testing And Fine-Tuning Of The System On The Ups, As Well As On-Site Validation And Testing To Meet Performance Requirements. The Schedule For The Second Phase Will Be Set In 2025. The Commissioning Of The Second Part Is Optional And Is Carried Out Unilaterally By The Client. Bidders Must Offer Both Parts Of The Offer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.