1) The Subject Of The Order Includes The Construction Of A Dn 110Pe Water Distribution Network With Connections And Hydrants And A Cable Control Network In Accordance With The Design Documentation, The Construction Of A Dn 160Pe Water Distribution Network With Connections And Hydrants, The Construction Of A Section Of The Storm Sewage System, The Construction Of A Drinking Water Tank And A Container Building , Technical - Disinfection Station, Renovation Of The Gate Valve Chamber At The Drinking Water Tank, Replacement Of The Switchboard For Controlling The Operation Of Pumps At The Water Intake, Renovation Of The Communication System, Construction Of A Fence, Monitoring Of The Tank And Emergency Power Supply For The Container Building On The Plots: Łącko District [0004] Dz. No. 1552/2, 1552/14, 1553/3, 1556, 1557/6, 1558/1, 1560, 1566/4, 1566/5, 1570/10, 1575/9, 1575/5, 1573/1, 1601 /1, 1616, 1633/5, 1634/1, 1634/2, 1633/4, 1634/4, 1634/5, 1634/6, 1634/7, 1634/8, 1691, 1697/2, Czerniec District [ 0001] 216/2, 216/3, 217/5, 217/2, 218/3, 219, 213/3 In Accordance With The Design Documentation Prepared By Proj-Bud Tomasz Dąbrowski Based In Łącko, Constituting Annex No. 8 To This Swz .2) In Detail, The Subject Of The Order Includes The Execution Of: 2.1) Water Distribution Network Dn 110Pe100rc Sdr11 Pn16 With A Length Of - 1336.80 M Along With Connections And Hydrants From Connection To The Existing Water Supply (W1) On Plot No. 1643/8 To The Designed Water Tank Drinking Water For Plot No. 1552/2. - Connection To The Existing Water Distribution Network Dn 110 Pe Through A Flange Tee 100/100/100 At Point W1 On Plot No. 1634/8. - Shut-Off Valves Dn 100 - 5 Pcs. - Underground Hydrants Dn 80 - 2 Pcs. - Water Supply Connections – 6 Pcs. Water Supply Connections Dn 40Pe100 Sdr11 Made By Using A Drill, Water Meter Well Dn 1000 Bet With A Water Meter Set. Additionally, A Section Of The Water Supply Network Dn 110Pe100rc Sdr11 Pn16 In A Steel Protective Pipe Dn 273*6.3, 19.40 M Long – Location: Crossing Dw 969 In Section 115 At Km 2 + 381 M. Łącko, Plot No. 1616 Should Be Constructed Using The Trenchless Method Using Hydraulic Jacking Technology With Pilot Drilling. 2.2) Water Distribution Network Dn 160Pe100rc Pn16 Sdr11 With A Length Of 808.80 M Along With Connections And Hydrants From The Existing Water Tank Drinking Water On Plot No. 1552/2 To The Designed Hydrant On Plot No. 1601/1. - Indirect Connection To The Existing Water Supply Network No. 110 Pe Through A Flange Four-Piece 150/110 At Point W2 (30) On Plot No. Shut-Off Valves Dn 150 - 6 Pcs. - Underground Hydrants Dn 80 - 1 Pc. - Above-Ground Hydrants Dn 80 - 6 Pcs. - Water Supply Connections - 7 Pcs. Water Supply Connections Dn 40Pe100 Sdr11 Made By Using A Drill, Water Meter Well Dn 1000 With A Set Water Meter. 2.3) Ykys 14*2.5 Mm Control Cable Network In A 1337.40 M Long Pe Protective Pipe From The Technical Building On Plot No. 1697/2 To The Designed Drinking Water Tank On Plot No. 1552/2, Sec