Expansion Of The Existing Chp System (Module 1 + 2) By 3. Module Essentially: - 1 Combined Heat And Power Plant With At Least 75 Kw Electric. As A Compact Module In A Heat And Sound-Insulating Housing On A Self-Supporting Steel Frame For Operation With Sewage Or Natural Gas - Adaptation And Expansion Of The Sewage Gas And Natural Gas Pipes To Supply The New Chp - Integrating The New Chp Into A Heat Distribution System With Central Emergency Cooling Including Heat Meters - Implementing The Existing Ones Gas Cleaning In Containers At A New Location Outside Including The Necessary Adjustments To The Gas And Heating Pipes - Approx. 100 M Stainless Steel Pipe Dn 32 - Dn 100 Including Insulation - Making Core Drillings And Fire Barriers For Pipes And Cables - 1 Control And Monitoring Cabinet For The Module-Related Switching And Control Devices For Auxiliary Drives, Measuring Devices, Automation Devices, Etc. Including User Software, Remote Diagnostic Access And Transfer Of Data To The Higher-Level Plc As Well As Acceptance Of Commands From The Process Control System - 1 Switchgear Panel As A Meter And Low-Voltage Switchgear - Approx. 250 M Of Cable And Line Installations Within Buildings Including Installation Systems - General Building Installation And Lighting - Earthing Systems, Potential Equalization And Lightning Protection - Maintenance Contract For Existing Chp Modules 1 + 2 And New 3Rd Chp
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.