Pollutants Tracking And Monitoring And Rehabilitation Services – Grundwassermonitoring Deuben 2025 - 2027. Around 110 Groundwater Measuring Points Or Wells, Which Are Located On A Total Area Of Around 45 Hectares, Are To Be Sampled At Mostly Quarterly And Annual Intervals. The Outcrops Were Built In Different Aquifers With Varying Yields. This Involves Different Sampling Times. In The Course Of The Sampling, The Water Level, Depth Sounding And The Determination Of The Conductive Parameters Must Be Carried Out. The Samples Must Be Analyzed In An Accredited Laboratory Essentially With Regard To The Following Parameters: Typical Pollutants Such As Phenol Index, Mkw, Pah, Nuclear Power Plants. The Volatile Volatiles Di-N-Butyl Ether And Alkylated Tetrahydropyran Must Be Determined In Accordance With Din 38407-43 At Selected Measuring Points. A Gc-Ms Method (Instructions For The Measurement Procedure) Is Provided For Both Easy Refugees. Furthermore, Various Anions And Cations As Well As Tic, Doc, Cod, Toc Determinations Are Required. The Determination Of Nso Heterocycles Is To Be Carried Out On A Selection Of Samples According To The Kora-Tv2 Guide. Comprehensive Requirements For Sampling (Lmbv Work Instructions Are Provided), Occupational Safety And Documentation Must Be Met.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.