Tenders Are Invited For L539 Finnentrop/Altfinnentrop, Closing The Gap Bridge Over The Bigge (Ba 3), Avenue Cycle Path: Setting Up The Structural Design For The Joint Pedestrian And Cycle Path Bridge Over The Bigge

Tender Detail

83506900
CXPNYYVDU30
Self-Funded
Tenders Are Invited For L539 Finnentrop/Altfinnentrop, Closing The Gap Bridge Over The Bigge (Ba 3), Avenue Cycle Path: Setting Up The Structural Design For The Joint Pedestrian And Cycle Path Bridge Over The Bigge
ICB
Western Europe
European Union,G20
22-08-2024

Work Detail

Description Of The Construction Measure To Be Examinedthe State Office For Road Construction Nrw (South Westphalia Regional Branch) Is Planning To Build A New Shared Footpath And Cycle Path Along The L539 In Altfinnentrop. At The Same Time, A Maintenance Measure Is To Be Carried Out On The L539 In The Area Of ​​The Through-Town Area (As Existing-Oriented Improvement). Immediately After Passing Through The Town Of Altfinnentrop, The Shared Walking And Cycling Path Is To Be Led Over A New Bridge Over The Bigge.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail