Tenders Are Invited For Machinery And Pipe Technology, New Construction Of A Reinductor

Tender Detail

83240734
CXCPPYFYYDCAY
Self-Funded
Tenders Are Invited For Machinery And Pipe Technology, New Construction Of A Reinductor
ICB
Western Europe
European Union,G20
16-08-2024

Work Detail

This Request Includes All Measures For The Construction Of A Rhine Culvert From Cologne-Niehl To Stammheim, Including The Rhine Crossing. The Scope Of Services Includes The Technical Equipment Relating To The Mechanical And Piping Technology Trade. The Following Main Equipment Parts Are Planned: - New Construction Of Stainless Steel Pipelines Dn 2,000 With A Total Length Of Approx. 40M, Dn 1,4000 With A Total Length Of Approx. 45M, Dn 1,100 With A Total Length Of 40M, Dn 80 To Dn 800 With A Total Length Of Approx. 460M, As Well As Shut-Off Valves In The Specified Nominal Widths. -Steel And Stage Structures Made Of Stainless Steel And Galvanized Steel With A Total Weight Of Approx. 50,000Kg. - Renewal And New Construction Of Ventilation Systems For Three Structures On The Left And Right Bank Of The Rhine. - Dismantling And Replacing The Exhaust Air Treatment System For The Sewer Connection On The Left Bank Of The Rhine With A Double Valve Structure. - Construction Of Air Dehumidification Systems In The Buildings On The Left And Right Banks Of The Rhine. - New Construction Of Six Channel Valves For The Sewer Connection On The Left Bank Of The Rhine In The Double Gate Structure For The Three Culvert Pipes Dn 1,100, Dn 1,400 And Dn 2,000, As Well As Three Channel Valves For The Channel Connection On The Right Bank Of The Rhine In The Gate And Union Structure For The Three Culvert Pipes Dn 1,100, Dn 1,400 And Dn 2,000. Furthermore, A Throttle Valve (3,000X2,500Mm) In The Inlet Canal On The Right Bank Of The Rhine And A Gate Valve Connected To The Existing Canal Of The Gkw On The Right Bank Of The Rhine. - Construction Of 5 Emptying And Drainage Pumps In The Head Of The Culvert With Drainage In Front Of The Double Slide Valve Structure, As Well As In The Inspection And Mid Shaft. - Production Of A Total Of Three Crane Systems In The Culvert Head, Inspection Shaft And Mid Shaft

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail