Tenders Are Invited For Modernization Of Lighting With Replacement Of Existing Lighting Fixtures With Led Fixtures In The Dubienka Commune - Repeated Procedure

Tender Detail

79484560
GP.271.2a.2024
Self-Funded
Tenders Are Invited For Modernization Of Lighting With Replacement Of Existing Lighting Fixtures With Led Fixtures In The Dubienka Commune - Repeated Procedure
ICB
central europe
European Union
07-05-2024

Work Detail

1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Modernization Of Lighting And The Replacement Of Existing Lighting Fixtures With Led Fixtures In The Dubienka Commune. 1.1. The Scope Of Works Includes The Replacement Of Existing Lighting Fixtures With Led Fixtures And The Modernization Of Selected Control Points (So Lighting Cabinets) In The Dubienka Commune. During The Modernization Works, The Following Will Be Carried Out: - Disassembly Of Worn-Out Lighting Fixtures (270 Pcs), - Installation Of New Led Lighting Fixtures (270 Pcs), - Testing And Control Measurements Of Lighting Fixtures, - Led Lighting Fixtures Are To Have Enec, Enec+ Certificates, Zd4i Or Equivalent With The Possibility Of Remote Control Without Additional Modification Of The Luminaire, - Pulling Wires Into The Booms To Power The Luminaires, - Installation Of Equipment Securing The Luminaires And Lighting Circuits, - Installation Of New Terminals Powering The Luminaires, - Disposal Of Old Luminaires And Equipment With Settlement, - Preparation Of As-Built Documentation , - Modernization Works On Low-Voltage Lines Must Be Carried Out Exclusively Using The Live Work Technology (Ppn) Applicable In Pged, Only By Persons Authorized By Re Chełm (Included In The List Of Persons Approved By The Director Of Pge Dystrybucja S.A. Zamość Branch) Having The Qualifications Required By Law. ;- Before Starting Work On Power Equipment, The Conditions For Safe Performance Of Work In The Chełm Energy District Must Be Agreed Upon And The Necessary Equipment Shutdowns Must Be Obtained, - For All Planned Works, A Work Schedule Prepared By The Contractor Must Be Submitted To Re Chełm One Week In Advance For Works Performed Using Ppn Technology, And Two Weeks In Advance For Works Carried Out Requiring The Necessity To Turn Off The Devices, - Before Starting The Work, An Inventory Of The Dismantled Devices Constituting The Property Of Pged Should Be Made Each Time With A Representative Of The Network Assets Department Of Re Chełm, 1.2. Construction Works Covered By The Subject Of This Order Should Be Performed By Persons With Appropriate Experience, Qualifications And Authorizations, If Required Under The Law.2. A Detailed Description Of The Subject Of This Order Is Set Out In: 1) Technical Documentation - Collected In Annex No. 8 To The Swz - Including In Particular: A) Bill Of Quantities; B) Detailed Design; 2) Designed Provisions Of The Public Procurement Contract Constituting Annex No. 9 To The Swz;

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail