Tenders Are Invited For Replacement Of Heating Sources And Adaptation Of Rooms And Installations To New Heating Sources In Residential Buildings Owned By The Pomeranian Voivodeship

Tender Detail

79152466
DAZ-Z.272.16.2024
Self-Funded
Tenders Are Invited For Replacement Of Heating Sources And Adaptation Of Rooms And Installations To New Heating Sources In Residential Buildings Owned By The Pomeranian Voivodeship
ICB
central europe
European Union
29-04-2024

Work Detail

1. The Subject Of The Order Is The Implementation Of The Task Entitled: Replacement Of Heating Sources And Adaptation Of Rooms And Installations To New Heating Sources In Residential Buildings Owned By The Pomeranian Voivodeship. 2. The Task Will Be Performed On The Basis Of Architectural And Construction Designs And Technical Specifications For The Execution And Acceptance Of Works. .3.The Entire Order Is Divided Into 4 Separate Lots According To The Location Of The Buildings. 4. One Complete Installation With All Works Completed, I.E. All Elements Of The Order Relating To One Premises (One Heating Source), Will Constitute One Stage Of The Contract Implementation. 5. The Scope Of Works Is Divided Into 4 Parts, In The Following Locations: Part No. 1: 82 -410 Śledziówka 8 And 8A – 2 Heating Sources (2 Stages); Part No. 2: 83-120 Rybaki Ul. Wałowa 2 - 1 Heating Source; Part No. 3: 83-021 Krępiec 6 - 1 Heating Source; Part No. 4: 83-020 Kiezmark Ul. Gdańska 1/1 And 1/2 - 2 Heating Sources (2 Stages). 6. The Scope Of Works Includes, Among Others: (Depending On The Location) Execution Of: A) Installation Of: - Cold And Hot Water - The Scope Of Works Includes The Construction Of An Internal Cold And Hot Water Installation, Supplying Existing Or Designed Sanitary Equipment - Within A Specific Premises, - Central Heating - The Scope Of Works Includes The Construction Central Heating Installation - Including The Installation Of Radiators And A Heat Source - A Solid Fuel Boiler Of Energy Class 5 In Accordance With The Ecodesign Requirements, - Ventilation And Exhaust Gas Removal - The Scope Of Works Includes The Construction Of A Ventilation Installation And Exhaust Gas Removal From The Solid Fuel Boiler, - An Electric Installation To Power The Boiler Equipment, With Automation - The Scope Of Works Includes The Construction Of A Separate Circuit From The Main Switchboard To The Boiler Room; B) Demolition Works: - Dismantling Of Old Furnaces, - Dismantling Of Old Central Heating Pipelines. Including Fittings, - Dismantling Partition Walls, - Dismantling Doors And Windows, - Punching Holes In The Walls For The Cables Of The Designed Installations, - Cleaning And Disposal Of Post-Demolition Materials; C) Other Works: - Connecting The Designed Devices To Existing Hot And Cold Utility Water Installations, -Connecting The Designed Devices To Existing Central Heating Installations Thin-Walled Steel Pipes With Fittings, - Delivery And Installation Of Insulated Chimney Ducts For Ventilation And Exhaust Gas Discharge, - Delivery And Installation Of A Solid Fuel Boiler Meeting The Requirements Of Class 5 In Accordance With The Pn-En 303-5:2012 Standard Or Equivalent And Eu Directive No. : 2009/125/Ec Compliant With Ecodesign, - Delivery And Installation Of A Buffer Tank (Insulated) For The Central Heating Installation, - Delivery And Installation Of A Domestic Hot Water Tank (Central Heating + Electric Heaters), - Implementation Of Polyurethane Foam Insulation, - Brickwork Of Piers And Filling Missing Plasters In Places After Installation Works, - Construction Of Partition Walls Along With Surface Preparation And Painting In A Color Agreed With The User, - Installation Of Protective Sleeves, - Construction Of New Electrical Circuits To Power And Control The Furnace, - Adaptation Of Exhaust And Ventilation Chimneys To Applicable Regulations , - Tests And Examinations Of The Installation, - Installation Of Doors And Windows For The Boiler Room, - Repair Of Surfaces (Walls, Floors, Ceilings, Depending On Needs) After Interventions Related To The Implementation Of The Task, E.G. Filling Holes/Openings, Caulking, Priming, Painting , In Order To Restore The Aesthetic Values, - Preparation Of An Energy Performance Certificate After Replacing The Furnaces, - Performance Of Electrical Tests After The Electrical Installation, - Performance Of Chimney Sweep Tests (Checking Ventilation And Workmanship In Accordance With The Regulations), - Training Users In The Use And Operation Of New Furnaces. 6A. The Contractor Will Provide Service And Assistance In Using The Furnaces In The First Heating Season After Acceptance Of The Works.6B. During The Implementation Of The Subject Of The Order, The Contractor Will Ensure The Participation Of: - A Person With Qualifications As A Master In The Chimney Sweeping Craft, - A Person With A Category E Qualification Certificate Authorizing Him To Operate Group 1 Devices And Networks At The Operation Position, - A Person Entered In The Central Register Of Energy Performance Of Buildings, Authorized For The Preparation Of Energy Performance Certificates. 7. A Detailed Description Of The Subject Of The Order For Part No. 1 Is Specified In: 1) Architectural And Construction Design (Śledziówka 8 Lok. 1) 2) Architectural And Construction Design (Śledziówka 8 Lok. 2) 3) Technical Specification Of Execution And Acceptance Of Works (Śledziówka 8 Lok. 1)4) Technical Specification For The Execution And Acceptance Of Works (Śledziówka 8 Lok. 2) Which Constitutes Appendix No. 1A To The Swz Entitled Opz Part No. 1 (.Zip File); And The Draft Contract, Constituting Annex No. 2A To The Swz. The Ordering Party Indicates That In The Documentation Referred To In Points 1-4 Above), The Building At Śledziówka 8 Is Named: Śledziówka 8 Lok. No. 1, And The Building At Śledziówka 8A Is Located Under The Name Śledziówka 8 Lok. No. 2.8. The Ordering Party Also Provides Bills Of Quantities And Drawings For Each Part Of The Procedure, Which Are Of An Auxiliary Nature (Annex No. 1E To The Swz [.Zip File]). 9. The Contractor May Not Use Errors Or Omissions Contained In The Indicated Documentation And Should Immediately Notify The Ordering Party Of Their Detection, Who Will Make Appropriate Corrections Or Changes. The Data Specified In The Attached Documentation Are Considered Target Values ​​In Which Changes Are Permitted As Part Of The Arrangements With The Ordering Party.10. The Contractor Is Obliged To Verify The Provided Solutions, And In The Event Of Discrepancies In The Designed Solutions, The Contractor Will Not Claim Any Rights To Additional Remuneration.11 .The Contractor Is Obliged To Include In The Valuation And Offer Supplies And Additional Costs That May Occur During Construction Works Such As Those Being The Subject Of This Investment. 12. Note: The Works Will Be Carried Out In Used Residential Premises. The Area Of ​​The Works Must Be Properly Secured And Marked. 13. It Is Recommended That The Contractor, Before Submitting The Offer, Conducts An On-Site Inspection Of The Work Sites And Their Surroundings At His Own Expense. The On-Site Inspection For Part No. 1 Of The Procedure Will Take Place On April 19, 2024 At 9:00 A.M. At The Following Location: Śledziówka 8 And 8A, Postal Code: 82-410. Participation In The On-Site Visit Is Not Obligatory. Telephone Number For Contact Regarding The On-Site Visit: 58 32 68 776.14. The Minimum Warranty Period For Construction Works And Installed Devices Is 48 Months. Regardless Of The Warranty Granted For Construction Works And Installed Devices, Which Is The Criterion For Evaluating The Offers, The Contractor Is Liable To The Ordering Party Under The Warranty For Defects, On The Terms Specified In The Civil Code, I.E. The Contractor Is Liable Under The Warranty If A Physical Defect Is Detected Within Two Years In The Case Of The Installed Devices And Within Five Years For Construction Works. The Above Deadlines Are Counted From The Date Of Final Acceptance Of The Works.15. The Law Applicable To This Order (Including The Contract Concluded As A Result Of This Procedure And For The Assessment Of The Legal Effects Of All Documents In This Order) Is Polish Law, Taking Into Account The Law Of The European Union.16. In All Provisions Of The Swz And Its Annexes In Which The Ordering Party Refers To Standards, Approvals, Technical Specifications Or Reference Systems Or Indicates Trademarks, Parameters Or Sources Of Origin (Names Of Manufacturers Or Devices), In Accordance With Art. 99 Section 5 And Art. 101 Section 4 Of The Public Procurement Act, The Ordering Party Allows Equivalent Solutions. 17. If The Description Of The Subject Of The Order Includes The Names Of Materials And Products Of Specific Manufacturers, This Should Be Treated Only As A Definition Of The Desired Standard And Quality. In All Such Situations, The Contractor May Offer Equivalent Materials And Products With At Least The Same Technical And Quality Parameters. Product Equivalence Means Offering A Product Whose Technical Parameters Of The Materials Used, Efficiency, Durability And Quality Are Not Inferior To The Quality Of The Materials And Products Described In The Swz.18. The Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solutions He Offers The Solution Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches To The Offer A List Of Equivalent Solutions Along With Its Description Or Standards. 19. The Ordering Party Does Not Reserve The Right To Apply For The Order Only By Contractors Referred To In Art. 94 Of The Pzp.C.D. Act In Section Ix - Other Information

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail